<br />COR #212 21 $ 3,824.00 Provide power for fuWre waste disposal unit5 per PR 890 $ 2,652 $ 1.172 <br />$ 585 $ 258 <br />COR #213 21 b 843.00 Provide plate stifteners per RFI 372 <br />DA 431 seismic ties at all window jamGS in lieu of type specified <br />id <br />P g~ p g 358 <br />$ <br />rov <br />e <br />COR ft214 21 S 1,168.00 <br />611.00 ProviOe blocking with 2X support at the top of the RTU curbs per RFI 475 <br />COR f1216 21 $ 1 117 $ 4~ <br />S <br />992 <br />937 $ 14 <br />3 <br />, <br />COR ~F88r 22 S 48,929.00 Provide changes to door hardware per PR N24 (w/prdreaders) , <br />, <br />$ 3 <br />150 $ 3,159 <br />$ 7 <br />COR ~183r 22 S 70,309.00 Provide changes to deck in nort~wesl of site per PR tR53 , <br />$ - $ 3,625 <br />COR il'220 22 S 1,625.00 Provide modification to reception counter in rtn #5120 per PR #93 499 <br />447 $ 5 <br />12 <br />COR i222 22 S 17.948.00 Provide card readers and exit sensors for 11 doors. Conduits, BB and power in PR it52 <br />' , <br />, <br />$ <br />$ <br />s <br />COR ~224 22 S • Provide addidonal 100 amp, 277I480V panels to sene future needs and 3 phase FPB $ - <br />92~ <br />3a~ $ ~ <br />4 <br />COR i225 22 S 8,287.00 Provide furting over clips around window per RFI 227 ' <br />, <br />$ <br />248) $ (993) <br />$ (2 <br />241.00) Eliminate two flag poles on'B' line and Iuminaires wlbases per RFI 227 <br />t227 22 S (~ <br />COR , <br />288 <br />. <br />~ <br />00 Provide three ad0itional fire extinguishers anA four additional cabinets per RFI 380 <br />8 22 f 941 $ 653 S <br />. <br />COR /22 <br />00 Provide increased depth of inefal deck and increased gauge of D2cing in bridge deck per RFI $ - $ 4,557 <br />SS7 <br />9 T2 S 4 <br />' <br />. <br />, <br />22 <br />COR ~I <br />22 f • Change doors and relites P240A and P240B lo aluminum instead of WM $ - $ <br />COR /231 <br />COR ~F233 22 S 2,813.00 Provide interior signage modifiptions per PR A~94 $ 1,812 $ 801 <br />396 <br />741 $ 7 <br />3 16 <br />137.00 Provide brick pavers to bus mall aprons per PR 98 <br />F215 22 f 24 <br />OR , <br />, <br />363 <br />19 <br />, <br />~ <br />C <br />00 Provide additlonal duplex outlets and teledata outlets per PR #39 <br />478 <br />22 S 96 <br />~ , <br />$ 77,715 $ <br />. <br />, <br />236 <br />COR 1 <br />00 Provide additional rebar per structural engineers report of 2I24f00 <br />28~ <br />200 $ 89 <br />$ <br />• <br />COR f238 22 S <br />00 Provide closures for aluminum composite panela at pnopy supports per RFI 455 <br />385 <br />22 S 1 $ 96t $ 429 <br />. <br />, <br />COR #239 <br />00 Provide 30'X'30' access panel for grease duct per RF1474 <br />22 S 429 <br />. <br />COR #242 <br />COR il243 22 S 277.00 Change doors 1173 A and 1175 D to Oak per RFI 498 $ ~ 92 $ 85 <br />$ 463 $ 204 <br />COR #244 22 f 867.00 Add relite between rooms 1280 and 1281 per PR p88 $ 5 <br />669 $ 1,424 <br />COR #246 22 f 7,093.00 Provide (6) pairs of multimode fibers per PR #92 <br />rtnan 'Nobody fixture instead of type SJ. SJ Fixture on site-not retumable <br />Sh <br />id , <br />3 - $ ~•~8 <br />e <br />e <br />COR #247 22 S 1,548.00 Prov <br />COR #250 22 f 80J.00 Provide chair 2il in room 5125 per RFI 356 <br />g _ $ 803 <br />665) $ (735) <br />$ (1 <br />COR #252 22 S (2,~00.00) Provide elevator intercom perT~yssen Sound elevator letter ot 3/16/00 (VER) , <br />$ - $ (2.329) <br />COR tf253 22 S (2,329.00) Reduce the number of banner poles per PR #101 446) $ (15,z~~) <br />$ (34 <br />COR #256 22 S(49,68J.00) Revise fibertnesh requirements per PR # 15 , <br />$ $ <br />------- <br />- <br />$1,952,251.00 7oWl Committed-Conatruction Change Orders - ----- <br />_~--------- <br />$ 1,455,562 $ 496,689 <br />600 of COR i120 is a County only cost as it is related to the backfilling of areas that were environmentally impacted. <br />'$33 , <br />, <br />^$18,170 of COR #51 is a County only cost as it is related to the bac~lling of areas lhat were environmenfally impaded . <br />COUNTY CONTINGENCY RECONCILIATION $ Z <br />p76,696 <br />~ <br />Original Marion County Project Contingency- g ~~,q55,562) <br />Minus Change Orders g (318,024) <br />Minus T2nsfers to SoR Costs g ~ ~ <br />399 <br />, <br />Change Order Costs to be Allocated <br />Total R~maining ProJsct Contingsncy ~. 5~~.509 <br />::a:~.:~.=.:a:z=.:":::'::~`: <br />~o......:n...o::..: <br />TOTAL COUNTY CONTINGENCY SPENT S(1,773,586) <br />ConUngency spent as a percentage oi total County contingency . <br />(Excludes f2M alloted to debt raductlon) <br />