My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Melvin Mark- Change Order Requests Log
>
CS_Courthouse Square
>
Melvin Mark- Change Order Requests Log
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:09:43 PM
Creation date
8/1/2011 10:17:17 AM
Metadata
Fields
Template:
Building
RecordID
10252
Title
Melvin Mark- Change Order Requests Log
Company
Melvin Mark
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COURTHOUSE SQUARE <br />Project No. 9828 <br />CHANGE ORDER LOG <br />~ '~ C.O.s for Soil C.O.s for Owner ,C.O.s for V.E. , <br />COR # i ~~ DESCRIPTION ~~ CO #. ' Conditions Requests ', Proposals ', C.O.s for "Other" <br />1 Decommision, remove and dispose of underground storage <br />nd 03/15/1999 I 1 <br />nk f <br />t ' <br />$ 2 <br />530 <br />00 ' ~ <br />-- <br /> <br />2 a <br />ou <br />_~ <br />-- ------ -- ---- -- - <br />~ Resolve sanitary sewer and gasline conflicts at the intersection i I , <br />. <br />-_ _----~ <br />l --- __- _- - - <br />------ ------ _ _ _ , - <br />~I <br />' 'of Church and Chemeketta Streets , 1~ <br />_ _ i <br />! <br />--- _ - - ~ I$ 1,765.00 <br />__ - -- - _ ~ __ __. _ _ _ _ -- ----- <br />4 <br />-- -- _ <br />------ _ --- - ----- _ _ . <br />Remove and dispose off site 203.9 c.y. contaminated soil, @ ~ ' <br /> <br />_ <br />_ _ $60.00 / C. . 1 <br />-- - - -- -- ----- _ I _ _ _ ~ <br />y <br />1 , 5. <br />_ _ - --- <br />I <br />_ . . . _ _ - - <br />- _--- _ _ ~ _ _ _ ~. <br />5 - <br />. <br />Decommision, remove and dis ose of under round stora e <br />P 9 9 ~ <br />' ' <br /> n Court Street <br />. <br />_ <br />ound mid block o <br />tank f <br />-- ----- 1' $ 4,982.00 <br />___ _ _--- ----- i <br />- ___ __ _ _ __ _ __ - _ <br />__ _ - <br />6 - ~ <br />g p <br />~ <br />~ <br />---- <br />Chan e concrete com ressive stren th in footin ads from ~ <br /> 3000 psi to 5000 psi i 1 I $ 3,450.00 <br />9 Remove and dispose off site 268.54 c.y. contaminated soil, @~ ! ! <br />~ <br />I <br /> $60.00 I c.y. <br />--_ --- _ 2 ~, <br />_ _ , $ 16,112 _00 <br />_ _ __ -- - - <br />~ _ <br />I <br />- - _ __ I _ __ _ <br />_ __ <br />12 -- - <br />I ~~ ~, ' <br /> <br />Demolish underground vault along Court Street at mid block <br />+ 2I $ 685.00 '' <br /> <br />~ <br /> - -- _ ~ -- _ --- ----- - - <br />- - --- - <br />17' Remove and dis ose off site 691.17 c. contaminated soil, <br />P Y• @ ; , ~ ~ <br /> , $60.00 / c.y. 2~ $ 41,470.00 ; ~ ~ <br />20 Provide over excavation and compacted fill to areas of I, <br /> undocumented fill for areas # 1 thru # 3 ~ 3 $ 214,993.00 <br />21 ~ Remove and dispose off site 461.62 c.y. contaminated soil, @ ~ !, <br /> $60.00 / c.y. ~ 4 $ 27,697.00 ; <br />3 Provide excavation, removal and disposal of three tanks in the <br /> northwest corner of the site. Include bracing of traffic signal <br /> <br />5 <br />' <br />135 <br />$ 14 <br />00 <br />~ <br />~ <br />~ <br /> p <br />oles <br />-- - --- - ---- , <br />. <br />, <br />--- -- --- --- ---- -- -__-- -- <br />7 9 <br />Provide rework of forms, relocatin stored rebar and i I ~ <br /> dewatering related to over excavation <br />- __ .__ 5 <br />_ ~ $ 6,966.00 <br />-- - ~ <br />~ _ ~ <br />_ <br />- - <br />8 ; Cost sharing for Courthouse Square Partnering Session <br />- , 5 <br />_ _ <br />------- $ 1,876.00 <br />- i <br />~---- -_ <br />~ _. _--- <br />10 ---- <br />' Provide cavity wall insulation at exterior masonry walls of , ~~, <br />~ <br /> <br /> <br />- - I~ <br /> <br />- <br />rooms 1209, 1219 and 1239 , 5I <br /> <br />- - _ _ _- <br />---- -- - _---- <br />-- <br />~ <br /> <br />. - -- _ <br />--- _ - __ I $ 1,394.00 <br /> <br /> <br />_ __ <br />_-- <br />13 <br />_ ~ 5 <br />~ Delete Sump pump at Elevator # 1 per R.F I. # 158 i i <br />_ <br />. --- <br />--- -- . --- _ - - ~ <br /> <br /> <br />-_ - - _ _ $ (700.00) <br /> <br /> <br />- --- <br />18 Delete Low "E" coating on #3 surface of Bus Mall Glass ~ 5~, <br />_ __ _- _ <br />--- - --- -- - ; '$ (18,723.00) <br />____ _ _ _ - <br />- - - -- ___ <br />_ <br />19 ; <br />_--- <br />bus duct with conduit and wire for feed to <br />0 <br />A <br />Re lace 16 <br />P i <br /> <br />_ - <br />22 ~ q <br />p <br />~ <br />the roof to e w ment switchboard _ 5 <br />- - - ---- -- ___ -- __ ~ - --- <br />Provide couplers at top of parking level columns for future $ (1,744.00) <br />-- -- ~ --- - - --- -_~ <br />, <br />- - - ---- <br />~ <br /> <br />' north pad development 5 <br />' <br />$ 5,193 00 I. <br />~ _ <br />_ _-- - - _ ;_ ~ - _ _____-- <br />- . . <br />5 .__-- _ _ -_ - <br />- --- - _ _ <br />j -- <br />00) <br />$ (440 <br />23 g <br />Delete Post tensionin Tendon locators . <br />Change Order Log.xls 1 of 7 01/21/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.