Laserfiche WebLink
9/13/99 Courthouse Square <br /> Approved COR / CO Log <br /> COUNTY TRANSIT <br />COR CO A PPROVED <br />AMOUNT DESCRIPTION OF CHANGE A LLOCATION A LLOCATION <br />COR # 1 1 $ 2,530.00 Decomission, removal and disposal of UST encountered on 3-15-99 $ 2,530 $ - <br />541 <br />COR # 2 1 $ 765.00 <br />1 Resolve gas line conflicts during sewer line relocation $ 1,224 $ <br />COR # 3 5 $ , <br />135.00 <br />14 Excavate, remove and dispose of three tanks in the NW corner of the site $ 14,135 $ - <br />COR # 4 1 $ , <br />215.00 <br />12 Removal and disposal of contaminated soils-203.9 c.y. $ 12,215 $ - <br />COR # 5 1 $ , <br />4,982.00 Decomission, removal and disposal of UST encountered along s. blockface $ 4,982 <br />393 <br />2 $ <br />$ ' <br />057 <br />1 <br />COR # 6 1 $ 3,450.00 Increase compressive strength of footing pads from 3,000 to 5,000 psi $ , <br />832 <br />4 $ , <br />134 <br />2 <br />COR # 7 5 $ 6,966.00 Additional dewatering costs due to overexcavation $ , <br />938 $ , <br />938 <br />COR # 8 5 $ 1,876.00 Owner's share of partnering session $ <br />$ 112 <br />16 $ - <br />COR # 9 2 $ 16,112.00 Removal and disposal of contaminated soils-268.54 c.y. , <br />967 $ 427 <br />COR # 10 5 $ 1,394.00 Provide cavity wall insulation at exterior masonry walls of rooms 1209, 1219 and 1239 $ <br />COR # 11 <br />COR # 12 <br />2 <br />$ <br />685.00 <br />Demolition of water vault along Court street <br />$ 475 <br /> <br />486 $ <br /> <br />$ 210 <br /> <br />(214) <br />COR # 13 5 $ (700.00) Delete sump pump at elevator #1 $ ) <br />( <br />COR # 14 <br />COR # 15 <br />COR # 16 <br />COR # 17 <br />2 <br />$ <br />41,470.00 <br />Removal and disposal of contaminated soils <br />t <br />$ <br />$ <br />41,470 <br />986) <br />(12 <br />$ <br />$ _ <br /> <br />737) <br />(5 <br />COR # 18 5 $ 723.00) <br />(18 em <br />VE proposal #1-Delete low "E" coating on #3 surface of bus mall glass canopy sys , , <br />COR # 19 5 $ , <br />744.00) <br />(1 VE proposal #1-Replace 1600 amp bus duct with conduit and wire for feed to rooftop equip. $ (1,210) $ (534) <br />COR # 20 3 $ , <br />993.00 <br />214 ` Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils $ 159,414 $ 55,579 <br />COR # 21 4 $ , <br />697.00 <br />27 Removal and disposal of contaminated soils-461.62 c.y. $ 2~,697 $ - <br />COR # 22 5 $ , <br />00 <br />193 <br />5 Provide couplers at top of parking level columns for future north pad development $ 3,602 $ 1,591 <br />COR # 23 5 $ . <br />, <br />(440.00) Delete PT tendon locators $ <br />$ (305) <br />3,671 $ <br />$ (135) <br />1,621 <br />COR # 24 8 $ 5,292.00 Slab transition revisions <br />COR # 25 <br />COR # 26 <br />5 <br />$ <br />993.00 <br />Revise column ties after fabrication <br />$ ggg <br /> <br />373 $ <br /> <br />$ 304 <br /> <br />165 <br />COR # 27 5 <br />6 $ <br />$ 538.00 <br />00 <br />437 <br />32 Provide column tail revisions <br />Provide six parallel parking stalls w/ covered walkway -relocate future job trailers to Church $ <br />$ 22,498 $ 9,939 <br />COR # 28 <br />COR # 29 5 $ . <br />, <br />9,534.00 Revise column reinforcement detail $ 6,613 $ 2,921 <br />850 <br />COR # 30 5 $ 2,775.00 Provide added rebar at isolation joints $ 1,925 $ <br />COR # 31 <br />COR # 32 <br />COR # 33 <br />5 <br />$ <br />(1,081.00) <br />Delete link seal and ESP-1 $ <br /> <br />$ ~750~ <br /> <br />115 <br />1 $ <br /> <br />$ (331) <br /> <br />492 <br />COR # 34 9 $ 1,607.00 Add (4) hot water hose bibs per PR #8 , <br />