My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Melvin Mark- Change Order Requests Log
>
CS_Courthouse Square
>
Melvin Mark- Change Order Requests Log
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:09:43 PM
Creation date
8/1/2011 10:17:17 AM
Metadata
Fields
Template:
Building
RecordID
10252
Title
Melvin Mark- Change Order Requests Log
Company
Melvin Mark
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COR # 35 5 $ 074.00 <br />6 Revise columns to go to roof level at grids O/11 and O/12 $ 4,213 $ 1,861 <br />COR # 36 5 $ , <br />(2,547.00) Revise column type at grid J-10a $ <br />$ (1,767) <br />735 <br />21 $ <br />$ (780) <br />9,601 <br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ , <br />548 $ 242 <br />COR # 38 5 $ 790.00 Provide reinforcing at SOG beneath columns $ 424 <br />1 $ 629 <br />COR # 39 5 $ 2,053.00 Provide added footing and column , <br />COR # 40 <br />COR # 41 <br />COR # 42 <br />5 <br />$ <br />(8,962.00) <br />VE proposal #3-Revise precast panels to mitered corners instead of "U" shape <br />$ 6,216 <br />~ ) $ 2,746 <br />~ ~ <br />COR # 43 <br />$ _ <br />$ _ <br />COR # 44 5 $ - Provide flourescent lamp revisions $ $ <br />COR # 45 5 $ - Provide hollow metal frame revisions <br />COR # 46 <br />COR # 47 <br />5 <br />$ <br />963.00 <br />Provide floor hardener at rooms 1209, 1219, and 1239 $ ggg <br />73 $ <br />$ 2g5 <br />32 <br />COR # 48 5 $ 105.00 Change wall mounted water closet to floor mounted water closet in room 1224 $ <br />COR # 49 <br />COR #50 <br />5 <br />$ <br />315.00 <br />Remove and dispose of UST adjacent to Church Street $ <br /> <br />$ 315 <br />965 <br />67 $ <br />$ - <br />881 <br />22 <br />COR #51 7 $ 90,846.00 "'* Excavation of unsuitable subgrade/fill in areas of unsuitable or contaminated soils , , <br />COR #52 <br />COR #53 <br />5 <br />$ <br />3,186.00 <br />Revise foundation drain pipe specification $ 2,2~p <br />ggg $ <br />$ 976 <br />371 <br />COR #54 5 $ 1,210.00 Provide added rebar for pilaster at the SW air shaft $ <br />$ 334 <br />16 $ 7,216 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three building faces $ , <br />~58~ $ (25) <br />COR #56 5 $ (83.00) Provide changes to glazing <br />$ <br />1,088 <br />$ <br />481 <br />COR #57 8 $ 1,569.00 Change column in hearing room <br />COR #58 $ 5gg $ 252 <br />COR #59 8 $ 821.00 Added column ties <br />COR #60 <br />COR #61 <br />8 <br />$ <br />2,107.00 <br />Added rebar on GF1 per shop drawings <br />$ <br />1,461 <br />526 <br />$ <br />$ <br />646 <br />232 <br />COR #62 8 $ 758.00 Luminar base at flagpole $ <br />$ 602 <br />1 $ 7~8 <br />COR #63 8 $ 2,310.00 Stand pipe changes per PR #3 $ , <br />214 <br />28 $ 12,464 <br />COR #64 8 $ 40,678.00 Added rebar at pour strips $ , <br />(2,497) $ (1,103) <br />COR #65 8 $ (3,600.00) Delete 2' sand layer $ 144 $ 64 <br />COR #66 8 $ 208.00 Added steel bracing at canopy $ 412 <br />6 $ 2,833 <br />COR #67 8 $ 9,245.00 Change door frames per PR #31 $ , <br />384 $ 169 <br />COR #68 8 $ 553.00 Owner's job shack phone $ 80 $ 36 <br />COR #69 8 $ 116.00 Provide dowels at east stairwell $ 257 $ 114 <br />COR #70 8 $ 371.00 Provide thickened generator slab $ 527 <br />1 $ 674 <br />COR #71 8 $ 2,201.00 Provide changes to air intake $ , <br />318) <br />(3 $ <br />COR #72 8 $ (3,318.00) NTE credit on removal of three tanks , <br />
The URL can be used to link to this page
Your browser does not support the video tag.