Laserfiche WebLink
DOCUMENTS <br />DOCUMENT 00120 <br />SUPPLEMENTARY INSTRUCTIONS TO BIDDERS: <br />RESOURCE EFFICIENCY <br />------------------------------------------------------------- <br />INCORPORATE APPLICABLE STATEMENTS BELOW INTO STANDARD DOCUMENT 00120 - <br />SUPPLEMENTARY INSTRUCTIONS TO BIDDERS. <br />EDIT TO SUIT PROJECT AND LOCATION. <br />UNDER THE FOLLOWING HEADINGS~ INSERT APPLICABLE STATEMENTS. <br />------------------------------------------------------------- <br />PART 1 GENERAL <br />DESCRIPTION <br />A. The owner requires the Contractor to efficiently <br />use resources to the fulleat extent possible in the <br />completion of this Project. Resource efficient <br />aspects to be considered in completing this Project <br />include: [EDIT LIST BELOW TO SUIT PROJECT.] <br />1. Use of techniques that minimize waste <br />generation. <br />2. Reuse and renovation of existing structures in <br />lieu of demolition. <br />3. salvage of existing materials and items for <br />reuse or resale. <br />4. Reuse of materials on site where possible. <br />5. ltecycling of waste generated during the <br />demolition and construction processes. <br />[THIS IS AN APPROPRIATE LOCATION FOR ADDITIONAL <br />LANGUAGE REGARDING ENVIRONMENTAL PROVISIONS <br />BEYOND THE SCOPE OF THIS WASTESPEC, SUCH AS <br />REQUIRED USE OF RECYCLED-CONTENT MATERIALS.] <br />B. The Contractor is encouraged to include additional <br />resource efficient methods in the Project. <br />RELATED SECTIONS <br />A. The following Documents and Sections describe <br />specific areas where resource efficiency is to be <br />incorporated into the Project. <br />