My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction waste management which involvea recycling certain <br />materials. <br />step one: Estimate Total Project Waste and Amounts of Recyclable <br />Materials. <br />(1) Estimate the Total Project waste in cubic yards (cy) (1) <br />cy <br />(uae information from previous comparable projects.) <br />For each material to be recycled, estimate the amount <br />of waste to be recycled. If necessary, use typical <br />percentages of commercial construction waste provided <br />in section I above and multiply percentage by Total Project <br />Waste in line (1) above. Add linea as necessary. <br />(2a) Recyclable material ~1(identify): (2a) <br />cy <br />(2b) Recyclable material #2(identify): (2b) <br />cy <br /> (2c) Recyclable material ~3(identify): (2c) <br />cy <br /> (2d) Recyclable material ~4(identify): (2d) <br />cy <br /> (2e) Recyclable material ~5(identify): (2e) <br />cy <br /> (2f) Recyclable material ~6(identify): (2f) <br />cy <br />(2) Add the total cubic yards in (2a) through (2f) above <br />to get the Total Recyclable Materials Amount (2) <br />cy <br />(3) subtract line (2) from line (1) to get the Non- <br />recyclable Material Amount (3) <br />cy <br />step Two: Estimate the cost of waste management if you use one <br />recycling hauler. (Note: This service is not available in all local <br />areas.) <br />(4) If you use a hauler to collect all waste and sort <br />out the recyclables and recycle them, then record the <br />cost per cubic yard for this aervice (including all hauling, <br />container rental, and tipping fee charges). (4) <br />$ /cy <br />(5) Multiply the coat from line (4) by line (1) to get the <br />Net Total Cost of Waste Management using one <br />hauler who separates out recyclables. (5) <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.