Laserfiche WebLink
construction waste management which involvea recycling certain <br />materials. <br />step one: Estimate Total Project Waste and Amounts of Recyclable <br />Materials. <br />(1) Estimate the Total Project waste in cubic yards (cy) (1) <br />cy <br />(uae information from previous comparable projects.) <br />For each material to be recycled, estimate the amount <br />of waste to be recycled. If necessary, use typical <br />percentages of commercial construction waste provided <br />in section I above and multiply percentage by Total Project <br />Waste in line (1) above. Add linea as necessary. <br />(2a) Recyclable material ~1(identify): (2a) <br />cy <br />(2b) Recyclable material #2(identify): (2b) <br />cy <br /> (2c) Recyclable material ~3(identify): (2c) <br />cy <br /> (2d) Recyclable material ~4(identify): (2d) <br />cy <br /> (2e) Recyclable material ~5(identify): (2e) <br />cy <br /> (2f) Recyclable material ~6(identify): (2f) <br />cy <br />(2) Add the total cubic yards in (2a) through (2f) above <br />to get the Total Recyclable Materials Amount (2) <br />cy <br />(3) subtract line (2) from line (1) to get the Non- <br />recyclable Material Amount (3) <br />cy <br />step Two: Estimate the cost of waste management if you use one <br />recycling hauler. (Note: This service is not available in all local <br />areas.) <br />(4) If you use a hauler to collect all waste and sort <br />out the recyclables and recycle them, then record the <br />cost per cubic yard for this aervice (including all hauling, <br />container rental, and tipping fee charges). (4) <br />$ /cy <br />(5) Multiply the coat from line (4) by line (1) to get the <br />Net Total Cost of Waste Management using one <br />hauler who separates out recyclables. (5) <br />$ <br />