Laserfiche WebLink
step Three: Estimate the coat of recyclinq if you separate <br />materials on site and have them hauled separately to market. (This is <br />an alternative to Step Two.) <br />Estimate the cost of transporting to market each recyclable <br />material you plan to transport uaing an outside hauler who <br />provides containers. Add lines as necessary. <br />(6a)Divide cubic yards of one recyclable material <br />(identify) from line (2) by container <br />capacity, round off to nearest whole nwnber (_), <br />and multiply by container hauling cost. Add cost <br />of container rental if not included in hauling coat. (6a) <br />$ <br />(6b)Divide cubic yards of another recyclable material <br />(identify) from line (2) by container <br />capacity, round off to nearest whole number (_), <br />and multiply by container hauling cost. Add cost <br />of container rental if not included in hauling cost. (6b) <br />$ <br />(6c)nivide cubic yards of another recyclable material <br />(identify) from line (2) by container <br />capacity, round off to nearest whole number (_), <br />and multiply by container hauling cost. Add cost <br />of container rental if not included in hauling coat. (6c) <br />$ <br />(6) Add lines (6a) through (6c). (6) <br />$ <br />Estimate the cost of transporting to market each recyclable <br />material you plan to transport to market--yourself. Add <br />lines as necessary. <br />(7a) Divide cubic yards of recyclable material <br />(identify) from line (2) by per load <br />capacity, round off to nearest whole number (_), <br />multiply by hours per trip (_) and per hour labor <br />and trucking costa ($_). (~a) <br />$ <br />(7b) nivide cubic yards of recyclable material <br />(identify) from line (2) by per load <br />capacity, round off to nearest whole number (_), <br />multiply by hours per trip (_) and per hour labor <br />and trucking costs ($_). (~b1 <br />$ <br />(7c) Divide cubic yards of recyclable material <br />(identify) from line (2) by per load <br />capacity, round off to nearest whole number (_), <br />multiply by hours per trip (_) and per hour labor <br />