My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
step Three: Estimate the coat of recyclinq if you separate <br />materials on site and have them hauled separately to market. (This is <br />an alternative to Step Two.) <br />Estimate the cost of transporting to market each recyclable <br />material you plan to transport uaing an outside hauler who <br />provides containers. Add lines as necessary. <br />(6a)Divide cubic yards of one recyclable material <br />(identify) from line (2) by container <br />capacity, round off to nearest whole nwnber (_), <br />and multiply by container hauling cost. Add cost <br />of container rental if not included in hauling coat. (6a) <br />$ <br />(6b)Divide cubic yards of another recyclable material <br />(identify) from line (2) by container <br />capacity, round off to nearest whole number (_), <br />and multiply by container hauling cost. Add cost <br />of container rental if not included in hauling cost. (6b) <br />$ <br />(6c)nivide cubic yards of another recyclable material <br />(identify) from line (2) by container <br />capacity, round off to nearest whole number (_), <br />and multiply by container hauling cost. Add cost <br />of container rental if not included in hauling coat. (6c) <br />$ <br />(6) Add lines (6a) through (6c). (6) <br />$ <br />Estimate the cost of transporting to market each recyclable <br />material you plan to transport to market--yourself. Add <br />lines as necessary. <br />(7a) Divide cubic yards of recyclable material <br />(identify) from line (2) by per load <br />capacity, round off to nearest whole number (_), <br />multiply by hours per trip (_) and per hour labor <br />and trucking costa ($_). (~a) <br />$ <br />(7b) nivide cubic yards of recyclable material <br />(identify) from line (2) by per load <br />capacity, round off to nearest whole number (_), <br />multiply by hours per trip (_) and per hour labor <br />and trucking costs ($_). (~b1 <br />$ <br />(7c) Divide cubic yards of recyclable material <br />(identify) from line (2) by per load <br />capacity, round off to nearest whole number (_), <br />multiply by hours per trip (_) and per hour labor <br />
The URL can be used to link to this page
Your browser does not support the video tag.