My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and trucking costs ($ ). (~~) <br />$ <br />$ <br />(7) Add lines (7a) through (7c) <br />(~) <br />Estimate the amount of revenue to be received from <br />selling each material in lines (8a) through (8c). Add <br />lines as necessary. <br />(8a) Multiply cubic yards of recyclable material <br />identified in line (7a) by market price per cubic <br />yard for that material ($_). (Use conversion <br />table in section II above if necessary). (8a) <br />$ <br />(8b) Multiply cubic yards of recyclable material <br />identified in line (7b) by market price per cubic <br />yard for that material ($_). (Use conversion <br />table in section II above if necessary). <br />(8b) $ <br />(8c) Multiply cubic yards of recyclable material <br />identified in line (7c) by market price per cubic <br />yard for that material ($_). (vse conversion <br />table in section II above if necessary.) (8c) <br />$ <br />$ <br />$ <br />$ <br />(8) Add lines (8a) though (8c). <br />(8) <br />(9) Subtract line (8) from line (7). (9) <br />(10) Estimate the number of extra hours needed to sort and <br />monitor separated waste (_) and multiply by per hour <br />labor cost ($_ ). (10) <br />(11) Estimate the cost of disposing of nonrecyclable <br />waste by multiplying the Nonrecyclable Material Amount <br />from line (3) above by the cost per cubic yard of disposing <br />of this waste in a landfill, including container rental, <br />transportation, labor, and landfill tipping fee. (USe <br />conversion figures in section II above if necessary.) <br />~11~ $ -- <br />(12) Add lines (6), (9), (10) and (11) to get the Net Total <br />Cost of Waste Management using source separation <br />of recyclables. (121 <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.