My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3140 Del Webb Avenue NE <br />Salem, OR 97303-4165 <br />503-588-2424 Fax 588-0209 <br />E-mail: cherriots.org <br />January 26, 1999 <br />Lew Garrison <br />City Traffic Engineer <br />Sa1em City Hall <br />Room 325 <br />555 Liberty St. SE <br />Salem, OR 97301 <br />Deaz Lew, <br />~,~~.P.YYLD~+l <br />This letter is intended to confirm the directions we agreed to take in our discussions with <br />Dick Woelk, Terry Hockett, and Leonard Lodder this afternooq regarding the signal <br />prioritization specifications for Courthouse Square (CHZ). <br />My understanding is as follows: Terry will work through and test the software options and <br />provide his recommendations for the signaU'mtersection operations to Dick within the next <br />two weeks or so. Dick will then amend the technical drawings to ensure that the concepts <br />devised by Terry will be fully supported by the wiring, conduits, and other hardware that will <br />be put in place by the CHZ contractors. Dick's drawings will be provided to you for your <br />review and final concurrence. The drawings would then go to Leonard for inclusion in the <br />construction documents. <br />Some of the specific issues we discussed that are going to be incorporated in the work done <br />by Terry and Dick included: <br />• complete preemption of the upstream intersections by the CHZ signalization system <br />• the addition of conduit/cable from CH2 to the controllers at the Chemeketa/H'igh and <br />Court/Church intersections <br />• location of the video detectors at the appropriate height on the superstructure, and <br />targeted to the optimum location for bus movement <br />• specification of the correct cable connecting the video detectors to the operating system <br />• placement of conduit/cable directly across the streets from CH2 to the transit signals, <br />rather than to-and-from the intersections (to resolve voltage drop concerns) <br />• signage at the driveways points on High St. and Church St., alerting vehicles exiting those <br />points of the bus conflicts (Leonard's issue--not part of Dick's or Terry's work) <br />It was presumed by all in attendance that the existing construction document drawings as <br />contained in the bid package would not need to be changed by an addendum to the bid. The <br />(~`V <br />~~~ <br />a~ ~ <br />Go ~y~ <br />\ <br />Q <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.