Laserfiche WebLink
Mr. Lew Garrison <br />page 2 <br />types of changes to the contractor's work needed to implement the signal prioritization <br />system should be very small, and do not warrant an addendum to the bid. <br />If my conclusions are not consistent with yours, Lew, I would appreciate your getting in <br />touch with me to clarify any of these issues as needed. I'm sure you share my desire to get <br />the best system developed that we can have at Courthouse Square. Thanks for your help <br />toward that end. <br />Sincerely, <br />Whittington <br />Project Coordinator <br />cc Billy Wasson ~~ <br />Leonard Lodder <br />Terry Hockett <br />Dick Woelk <br />~ <br />