My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOC Files (Folders 1-3)
>
CS_Courthouse Square
>
BOC Files (Folders 1-3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:07:50 PM
Creation date
8/2/2011 3:23:53 PM
Metadata
Fields
Template:
Building
RecordID
10068
Title
BOC Files (Folders 1-3)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Solid Waste Department Rent Pre pavment <br />Billy Wasson said the issue of Solid Waste Department pre-paying their rent up <br />front is still to be discussed at the policy level. The projected cost will be ready <br />by the end of the week. Pre-payment of the rent will lower the amount of <br />financed funding. <br />Mr. Vessello said he wants to move ahead with the project. <br />Joint MeetinQ <br />R.G. Andersen-Wyckoff noted the recommendation will be reviewed by both the <br />Transit District Board of Directors and Marion County Commissioners at a joint <br />meeting on September 2, 1998 at 10:00 am. <br />David Cameron asked if the Boards need an actual letter from the CAC <br />Committee. R.G. Andersen-Wyckoff noted it can be done in the form of a motion <br />that includes any caveats from the Committee. <br />Maynard Hammer said he wants to review the working documents as the project <br />proceeds. Leonard Lodder noted the construction documents will take about <br />sixteen weeks and should be ready about mid-December. There will be <br />occasions to review the documents at the mechanical/engineering stage, or 35% <br />of the way through. <br />CARL BEACH MOVED THAT, BASED ON THE BUDGET ESTIMATES, WE <br />PROCEED TO THE NEXT PHASE OF APPROVAL BY BOTH BOARDS AND <br />PROCEED TO THE BIDDING OF THE PROJECT WITH THE FIRST <br />ALTERNATE. MAYNARD HAMMER SECONDED. <br />David Cameron asked if the second alternative was out of the picture. Billy <br />Wasson noted staff will bring that back as a separate agenda item. <br />Maynard Hammer said he wants to make sure CAC has a chance to review the <br />issues before moving to the next step. Issues: Parking, Gas, Recycled <br />Materials. <br />Maynard Hammer noted there will be other issues come up in the working <br />drawings such as open land scape and office configuration that CAC should <br />review. <br />Motion carried unanimously. <br />Billy Wasson noted the minutes of this meeting will be presented at the joint <br />Board meeting on September 2, 1998. <br />The ne~ct joint meeting with CAC and JCT will be September 17 at noon. <br />The meeting adjourned at 1:50 pm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.