My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOC Files (Folders 1-3)
>
CS_Courthouse Square
>
BOC Files (Folders 1-3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:07:50 PM
Creation date
8/2/2011 3:23:53 PM
Metadata
Fields
Template:
Building
RecordID
10068
Title
BOC Files (Folders 1-3)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SAMTD Board of Directors <br />February 17,1999 <br />Page 3 <br />previous budget, reflecting the selection of the recommended add altemates <br />and, particularly, the favorable bids. The project maintains a 5% contingency <br />line item based on the anticipated construction cost. <br />10. The Citizens Advisory Committee voted unanimously (three members present) <br />in favor of the staff recommendation as presented in this memo. They were <br />very pleased with the bids that were received, and the manner in which the bid <br />altemates were dealt with. <br />11. The contract with the general contractor has already been developed, and was <br />reviewed and approved by County and District legal counsels prior to its <br />inclusion in the invitation for bids. Because of this step that has been taken, we <br />expect the negotiation of the contract with the approved bidder to be relatively <br />quick and simple. <br />12. The criterion for selection of the contractor as presented in the bid documents is <br />the lowest responsible bidder, "on the basis of the sum of the base bid and <br />altemates accepted." <br />Recommendation <br />Staff s recommendation is united with that of the County's project coordinator and <br />the project's Citizen Advisory Committee: we recommend that the Board 1) <br />approve the base CH2 proiect plus add altemates ' in the <br />amount of $18 459 484 as identified in attachment B(includina exclusive <br />District fundinq of Altemates 10, 11, and 151, 2) approve the selection of <br />Pence/Kellv Construction Inc., as the low responsive bidder and qeneral <br />contractor for the Courthouse Square proiect, and 31 authorize the District's <br />Proiect Coordinator, as the Board's representative, to finalize and execute a <br />joirrt corrtract with Marion Courrtv and Pence/Kellv for the construction of <br />Courthouse Square, and thereupon to issue notice to proceed. <br />(C:WIy Documents~Board memo re bid award] <br />
The URL can be used to link to this page
Your browser does not support the video tag.