My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cost Consultants
>
CS_Courthouse Square
>
Cost Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:00:50 AM
Creation date
8/2/2011 3:35:30 PM
Metadata
Fields
Template:
Building
RecordID
10066
Title
Cost Consultants
Company
Gardiner & Clancy LLC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />January 13,1998 <br />Randy Curtis, Director <br />Marion County Generai Senrices <br />100 High Street NE <br />Salem, Oregon 97301 <br />RE: P~ogramming Process <br />Marion County Space Pianring <br />Cou~thouse Square <br />P~oJect No. 9742 <br />Dear Randy: <br />~o9,p, ~~-~- <br />C AR~ICKLE <br />~~Qs~ , 363 Ste~t Stn <br />O~,Gj~lem, ~9~ <br />y~~0~~581-4114 <br />COSTIC ARCHITECTS, INC. <br />~01-3533 <br />Fax: 503/581-3655 <br />At your request we are providing a descxiption of the Space Planning/P~ogrammi~g Process utilized during ou~ <br />i~voivement with this project <br />inil'rally, we teceived from Marion Coutrty a copy of the Facilities Master Plan, dated December 1993, prepared by the <br />W.E. Group. In addition, Marion County provided an update to the `Space Requi~ement Summary" listed as E~fiibit <br />No. 3 from the above ~efe~enoed report. In September of 1996, staff from Arbuckle Costic Ardi~ interviewed <br />Department Heads of Courriy Departrnents destgnated to move i~to Cou~thouse Square. The interview process was <br />designed ~o obtafi farrul'rarily with the curre~t space planning requirements and verification of staff growtl~ trends shown <br />in the W.E. Group report. A fotu page wotidng document, dated Ssptembe~ 30,1996, was produced as a supplement <br />to ti~e programming information previously received. <br />During June and Juty of 1997~ follo~wing a review of the wo~id~g document by you and othe~ County staff, interio~s staff <br />from Arbudde Costic Architeds agai~ interviewed staff at each of the designated Cou~iy Departrnents, preparatory to <br />nintting a design test on the avallable ~ffic:e spaoe. The resuits of this interview process are recorded in the fortn of <br />~ough notes as well as the preliminary space plan~i~g layouts produced for departmentai review. <br />Should you have any questions co~cemi~g the above referenced process, please call. <br />Sincere , <br />eonatd Lodder, A.IA <br />Architect <br />LL:nd <br />97423A <br />3 <br />Kim Arbuckle, AIA <br />Alan E. Costic, AlA <br />Wal[er E. Bensrr~n. Jr., AW <br />Clay4on Vorse, fUA <br />Ricl~rd S. Rothweiler, AIA <br />
The URL can be used to link to this page
Your browser does not support the video tag.