' NOU-12-1997 1~~51
<br />TASK IA TI~INATERING
<br />P.~4
<br />
<br />PfO~EGt Mattager 24 2,1 2 32,112
<br />Ceologist/Eng'-nesr ~50 2p ~1,oao al,ooo
<br />Qewstering for on-site heatment (gal.) $0.13 40,Q00 $5,200 ~,5,2~D
<br />~n-sit~ t~atrnent 52,500 52,500
<br />Dewatering with cfi $ite dEsposaf (gal.) $0.33 54,80Q S18,i17 $18,15~
<br />NPt~ES perm~t $55o 5550
<br />Expenses ~T00 ~700
<br />
<br />TASK N: GROLINDWATER WELL {NSTALLATIONIMCNITORINC~lREPOR'1'1NG
<br />Assumptions;
<br />Post-remadiationlconstruelion proundwater monitoring woutd be nr~aeasary to oDtsin aite ctosure;
<br />it conF~ma~tion samp{e resalis are suffici~nt tor Site closure, ifiis task w~l not be neoess~ry
<br />Insta111 well to $outheast in vicinity of Court an0 Churoh Street intersection (to 25 faetj
<br />Install '1 well through garag~ floor around fom'-er loeation of MW~
<br />Anafyze 2 sail sampteslboting +1 taA
<br />F]rilGng rates based on quotes fram GeoTech Explarations, Inc.
<br />NM!-10 efld MW-'11 wiU bb deiVOyed during BxCaVdtiOn and will 6e repldGQd
<br />5amptelanetyze groundwater finm 4 monitaring weNs quarterly tor 3 years
<br />Lsbor and expen,s~s inciud~ wetl instalf~Non o~ersight, groundwat~r monitoring, snd reporting
<br />
<br />ro~ect Managar ( hrlqtr
<br />Rev+ew(~ hr/qtr) ~88
<br />ffi1Q5
<br />12 ,
<br />51,260 .~8~
<br />34,260
<br />Geolo~isVEngineer (12 hrlqtr)
<br />prafEer (3 hriqtr}
<br />Proj6Ct ASSi~tant (3 hr/qV) S64
<br />$45
<br />$40 i74
<br />~6
<br />3S $~0,44o
<br />$1,620
<br />$1,440 510,440
<br />$1,620
<br />$9.440
<br />Soil TPFUquaRtification
<br />Soil BTEX $125
<br />~T5 5
<br />2 ~625
<br />5~50 5825
<br />$750
<br />GrtunQwater BTEX (4 wel~s + 1 flAfqv} $75 60 $4,56o 54,500
<br />Drilting ContrsctAr - wells
<br />Field Exp-baibrs,autv (S~ 25tqtr)
<br />Offce E enses ($~ao~ytr $1.190 4 $4.76Q
<br />31,800
<br />ii,3Q0 ~4,780
<br />$1 ~8Q0
<br />51,300
<br />
<br />TASK V: CLOSURE REPOR7ING
<br />A$sumpdons;
<br />R~pOrt findi~g5 frOm Tasks t A, and 111 and justify closure 1o DEO
<br />Review $145 4 $420
<br />GeologistlEngi~eer ~60 4b $2,400
<br />pratUpr ~A5 12 $540
<br />Project Assistant $40 8 3~~~
<br />CdST
<br />iA.311 f:
<br />TASlC IIAA C/~4/1Vr~~ i~n ~ uo t ~~c.~ ~
<br />~XCAVATiON - bEOOMMIS310NED USED OIL U5T .~~-.
<br />~1,880 ~ •-•---
<br />$4,670
<br />TASK II$: EXCAVATIQN - USED OiL USTANb DftYWELL 51,880 33,853
<br />TASK IfL' DEWAT~RINO $3,112 S27,G67
<br />7ASK IV: GROUNDWATER IN~IL tNS7ALUMONITdRIlJG 5+20,040 $13,135
<br />Century West Engin~nng
<br />Page 2
<br />s4Zfl
<br />$2,400
<br />5640
<br />szaa
<br />$fi,550
<br />$5,733
<br />~30,17a
<br />S,'33,175
<br />TQTAL P.04
<br />71J~lov9
<br />
|