Laserfiche WebLink
5.) Maintenance/warranty <br />6.) Pernut <br />Total labor costs @ $7,345.30 <br />J. PROJECT TOTAL QUOTATION: <br />Total equipment net price <br />Total labor costs <br />Project Cost <br />(Project list price $55,863.00) <br />ADD Alternate # 1 <br />Provide CCTV submix and control for local broadcast <br />Three (3) Biamp 801 mixers, 8 channel <br />One (1) 24 channel subsnake class 2P <br />L <br />One (1) Horizon 911 CB AC distribution <br />Three (3) label strips <br />Three (3) connect bays Biamp CP <br />Labor to install <br />*Installed price @ $4,001.00 <br />@ $600.00 <br />@ $ 45.30 <br />@ $36,389.00 <br />~a $ 7,345.30 <br />$43,734.30 <br />- - --- - -- - - - --- - - - C~~ <br />~2~ <br />ADD alternate #3 <br />Provide provisions in mixing system for future teleconferencing. Mixer upgrades <br />only. No extra teleconferencinQ equipment included at this point, only mixer capabilities <br />for future. <br />Three (3) IR.P 8x2 teleconferencing automixers with voice matic, level matic, <br />TEQ, TCA. Manufacturer: IRP TA4080 <br />*Total upgrade cost @ $720.00 <br />' Timeline <br />Contractor can be substantially complete with senator hearing room audio project <br />within 45 days A.R.O. <br />