My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bidders List
>
CS_Courthouse Square
>
Bidders List
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:24:02 AM
Creation date
8/3/2011 9:22:10 AM
Metadata
Fields
Template:
Building
RecordID
10082
Title
Bidders List
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A40RRISON BUILDING CORPORATION <br />PKOFk.'CSIONAL RESLIA7E . <br />Pagc 2 <br />CONSTRUCTION SERVICES <br />1. Complete an expanded proforma estimate and functional area breakdown to include all <br />Owner d ti~res. <br />2. Evaluate site considerations and soil conditions. <br />3. Aid in finalization of site utilization and owner requirements to develop the optimum <br />building program.. <br />Val~e Engin ri Services <br />4. Study schematic designs and costs for all basic systems and material, including: <br />a. Structural simplifications. <br />b. Exterior wall systems evaluation. <br />c. Mechanical and electrical input and application. <br />d. Most economic construction methods, specifica6ons and details. <br />e. Alternate material selections. <br />5. Prepare detailec~ preliminary construction cost estimates. <br />6. Prepare detaileti preliminary construction schedules. <br />7. Review detailed finish specifications for cost differentials. <br />phocn TT• Fin~l ilncian an~ nPVP~Op171el1t <br />1. Complete cost studies of Phase I Alternatives. <br />2. Assist Architect in final review of details and methods. <br />3. Prepare in Tnirial Guarante.~l I~~;aximvm Cost. utilizing a limited number of qualified <br />subcontractors. <br />4. Select list of qualified subcontractors for pricing in the final buyout process. <br />5. Qualify materials selected; determine availability and best price for construction <br />schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.