My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ' PENCE/KELLY <br />CONSTRUCTION, INC. <br />~ 27Q P~ne~ Loop SE, S~I~m, OR ~7~02 (607) ~99-7727 <br />PoAland(60~)274alH f~x(607)386-7477 <br />ccs ~ ~u~s <br />Meeting Minutes <br />No. 09 <br />Project Manager: Dave Hays <br />~ . . ~ . ~ - ~ : ~ • <br />F04.02 OLD 4/6199 Arbuckle Costic Architects LL <br />Owner's will verify that their Owner Supplied Operable Partitions (Detail 12/A5.2.1) will work to comply with <br />note 4 A6.5.3, A6.4.3 and A6.3.3. <br />5/13/99 - Partitions are at the Court House, they have been taken down. <br />5/20/99 - Randy Curtis will verify that this is what the owners want to use. <br />6/3/99 - Randy Curtis will verify if partitions are required on the project. Pence/Kelly will provide a VE <br />proposal to eliminate. <br />6/10/99 - Leonard will provide a spec to price a new system. <br />F05.01 OLD 5l6/99 Salem Area Transit JW <br />Dave is concerned with water penetration through the elevated building slab at the TOD site. Cars parked <br />beneath may be damaged by minerals leached from the slab. <br />5/27/99 - Leonard needs to know how long the water barrier will be required before he can specify <br />a water barrier. <br />6/3/99 - Billy says that it will probably be 2-3 years before the pad is developed and it will have pedestrian <br />traffic. John will confirm this with the Transit Board. <br />F09.01 NEW 6N0199 Arbuckle Costic Architects LL <br />Concern has been raised about the deck water proofing system. Leonard will contact Mira-Drain and <br />Trem-Proof to see that their products will work together. Leonard will work with Tim Terrich on requirements <br />for a test pad. John W. witl propose a location and P/K will provide a cost for the test pad. <br />G00.00 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />MECHANICAL CONCERNS <br />G04.01 OLD 5/6/99 Innerface Sign Systems, Inc. PW <br />The Parking Level Duct Work is being redesigned by Interface Engineering to address low clearances in the <br />Parking Garage and Exhaust fans. <br />5/13/99 - A Proposal Request is forth coming. P/K needs this resolved before the fire sprinkler drawings can <br />be completed. PR will be issued. <br />G08.01 OLD 6/3/99 Arbuckle Costic Architects LL <br />Leonard to consolidate PGE recommendations, and make sure the planning team has all of them. <br />6/10/99 - This item is on hold until the agreement between PGE and the county is finalized. <br />G09.01 NEW 6/10/99 Arbuckle Costic Architects LL <br />P/K needs the oil/water separator submittal approved as soon as possible. <br />H00.00 OLD 4/14/99 PencelKelly Construction, Inc. JG <br />ELECTRICAL CONCERNS <br />H03.01 OLD 4/29/99 Arbuckle Costic Architects •LL <br />The Transformer support sled is being redesigned. Pence / Kelly needs any structural revisions immediately. <br />5/27/99 - Tim Te~rich needs weight requirements for the slab design. The transformer sled will be issued as <br />a proposal request. <br />6/3/99 - Tim has the weights, does not affect slab. Still awaiting the PR for the transformer base. <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.