My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* ' PENCE/KELLY Meeting Minutes <br />CONSTRUCTION~ INC. NO. O9 <br />~ =7~7 PMe~ LooP SE, Sal~m, OR Y770t (60~) 7N.122~ <br />vonl~nd (so~):24Jttt Faa (60.7) 6C6-7~n <br />~~...,.,. Project Manager: Dave Hays <br />~ . . ~ . .- ~ :~ ~ <br />C06.04 CLO 5/27/99 Pence/Kelly Construction, (nc. SS <br />One Frac tank has been removed, the other will be removed when undocumented fill on the west side of the <br />site is excavated and water can be direct discharged. <br />6/3/99 - The Frac tanks will be removed in July when the mass ex is completed. <br />6/10/99 - Water is Direct Discharged now. <br />C09.01 NEW 6/10/99 PencelKelly Construction, (nc. DH <br />Tank removal at Church Street will have added cost. <br />D00.00 OLD 4h4/99 Pence/Kelly Construction, Inc. JG <br />CIVIL CONCERNS <br />D02.03 OLD 4/24/99 Century West Engineering - Salem EC <br />P/K does not have stamped copies of Geotec reports. Leonard will forvvard. <br />5/6/99 - Owners need to request signed copies of Geotec Repo~ts. <br />5/13/99 - Owners have asked Eric Collins for the Geotec reports and Initial Geotec report with the certified <br />P.E. stamp. <br />6/3/99 - This item is still outstanding. <br />D05.02 OLD 5/6/99 Arbuckle Costic Architects LL <br />A Proposal Request for boring 4" conduit across Court Street is forthcoming. <br />5/20/99 - P/K will locate existing conduit after perimeter wall is poured. A proposal request is forthcoming. <br />5/27/99 - Proposal Request 18 has been issued. <br />6/3/99 - Billy wants the proposal request to include pulling wire. Leonard will issue an additional proposal <br />request. <br />D07.01 OLD 5/27/99 Centu West Engineering - Salem EC <br />Eric Collins to determine if the project qualifies as a Brownfield sight, and what is required if not. <br />E00.00 OLD 4h4/99 Pence/Kelly Construction, Inc. JG <br />STRUCTURALCONCERNS <br />E09.01 NEW 6N0/99 Pence/Kelly Construction, Inc. DH <br />P/K to provide a discount for not installing the app~oximately 60 tendon locators. <br />P/K to provide cost for installing knockout sleeves for future services through the slab. <br />F00.00 OLD 4/14/99 Pence/Kelly Construction, (nc. JG <br />ARCHITECTURAL CONCERNS <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.