My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' PENCEIKELLY Meeting Minutes <br />/ CONSTRUCTION, INC. NO. ~ O <br />` ra a.nw t.oon sR swm, oR maoz ~eoa~ a~am <br />~ A~ ~~~+ ~.x t~s~ a~easn Project Manager: DBVB Heys <br />~ . . ~ . .• ~ :~ • - <br />H04.01 OLD 5/6/99 Salem Area Transit JW <br />Owners to provide Security Camera heights and locations at the Bus Mall. (See RFI 183) <br />4/13/99 - Security Camera Heights will be indicated on shop drawings. Owners and Designers will meet to <br />assess their security needs. <br />4/20/99 - Conduit stub locations are needed by 01 July 1999. <br />H04.02 OLD 5/6/99 Arbuckle Costic Architects LL <br />Owners wili need additional Card Readers for 21 doors not noted on electrical prints. (see RFI 184.) <br />Melvin Mark requested that the security system be reviewed by the owners. Pence/Kelly needs rough-in <br />requirements. <br />6/3/99 - PR will be issued, information is needed prior to 01 July 1999. <br />6/10/99 - Rough in location for conduit in the slab is needed now. Leonard will forward the first of next week. <br />6/17/99 - Leoanrd will issue P.R. this week <br />H09.01 OLD 6H0/99 ArbuCkle Costic ArChitects LL <br />Per the City plan review, some illuminated exit signs have been added and relocated, Leonard to issue a PR <br />for the additional fixtures. <br />6/17/99 - Leonard will have Interface engineering review city approved plans. <br />H09.02 CLO 6/10/99 Pence/Kel Construction, Inc. SS <br />Electrical coordination meeting with the electrical subcontractor, P/K, and Leonard will be heid at the P/K site <br />office at 10:00 am on Wednesday the 16th. <br />6/17/99 - The meeting has been resolved. <br />100.00 OLD 4/14/99 Pence/Kelly Consbvction~ Inc. JG <br />SUBMITTAL REVIEW <br />100.01 OLD 4h4/99 Pence/Kell Construction, Inc. JG <br /> Please see the Submittal Log dated 6/22/99 <br />107.03 OLD 5/27/99 Pence/Kell Construction, Inc. JG <br /> Elevator Cab Interior must be resubmitted. ~eonard would like to change it to a wood veneer. <br />108.01 OLD 6/3/99 Arbuckle Costic Architects LL <br /> Pence/Kelly does not have PR 19 and 20. <br />J00.00 OLD 4H4/99 Pence/Kell Construction, Inc. JG <br /> RFI REVIEW <br />J00.01 OLD 4h4/99 Pence/Kell Construction, Inc. JG <br /> Please see the Outstanding RFI Log dated 6/17/99 and items marked as urgent. <br />K00.00 OLD 4114/99 Pence/Kell Construction, inc. .lG <br />ISSUE 8 VE REVIEW <br />K01.01 OLD 4H4199 Pence/Kell Construction~ Inc. JG <br />Please see the Issue and VE Logs for items that may have a potential cost or time impact, distributed during <br />meeting. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.