Laserfiche WebLink
PENCE/KELLY Meeting Minutes <br />CONSTRUCTION~ INC. NO. ~ O <br />ra ~~ se, s.am, oR s~w~ ~eoa~ a»asrs <br />~~~, n•+••+ f,x cea,~ ~+n Project Manager: Dave Hays <br />F05.01 OLD 516199 Salem Area Transit ~W <br />Dave is concemed with water penetration through the elevated building slab at the TOD site. Cars parked <br />beneath may be damaged by minerals leached from the slab. <br />5/27/99 - Leonard needs to know how long the water bamer will be required before he can specify <br />a water barrier. <br />6/3/99 - Billy says that it will probably be 2-3 years before the pad is developed and it will have pedestrian <br />traffic. John will confirm this with the Transit Board. <br />F09.07 UNS 6h0199 Arbuckle Costic Architects LL <br />Concem has been raised about the deck water proofing system. P/K has contacted Mira-Drain and <br />Trem-Proof to see that their products will work together. Leonard will work with Tim Terrich on requi~ements <br />for a test pad. John W. will propose a location and P/K will coordinater the test pad. <br />6/17/99 - An example of a simular system is THE SEATTLE NORTHGATE BUS MALL tel: (206) 684-1360. <br />Leonard will contact. <br />F10.01 NEW 6H7/99 Pence/Kell Construction, Inc. JG <br />Leionard to issue a Proposal Request for running carpet under partitions~ ~p(~~j ~Q,C~ <br />F10.02 NEW 6h7/99 Arbuckle Costic Architects LL <br />Leonard to issue a Proposal Request on Door strikes this week. <br />G00.00 OLD 4/14/99 Pence/Kell Construction, Inc. JG <br />MECHANICAL CONCERNS <br />G04.01 OLD 5/6/99 I erface PW <br />The Parking Level Duct Wo~lc is being redesigned by Interface Engineering to address low clearances in the <br />Parking Garage and Exhaust fans. <br />5/13/99 - A Proposal Request is forth coming. P/K needs this resolved before the fire sprinkler drawings can <br />be completed. PR will be issued. <br />G08.01 OLD 6/3/99 ArbuCkle Costic ArChiteCts LL <br />Leonard to consolidate PGE recommendations, and make sure the planning team has all of them. <br />6/10/99 - This item is on hold until the agreement between PGE and the county is final'¢ed. <br />G09.01 OLD 6H0/99 Arbuckle Costic Archltects LL <br />P/K needs the oil/water separator submittal approved as soon as possible. <br />H00.00 OLD 4J14/99 Pence/Kel) Construction, lnc. JG <br />ELECTRICAL CONCERNS <br />~ , . ,,.pt;U , . ,,+4l291~g ~rbncicte ~vsHC ~r~i1'its~ta ~ .~. t~ . , ~ <br />The Transformer support sled is being redesigned. Pence / Kelly needs any structural revisions immediately. <br />5/27/99 - Tim Terrich needs weight requirements for the slab design. The transfoRner sled will be issued as <br />a proposal request. ~ <br />6/3/99 - Tim has the weights, does not affect slab. Still awaiting the PR for the transformer base. <br />Page 4 of 6 <br />