My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PENCE/KELLY Meeting Minutes <br />CONSTRUCTION, INC. NO. 'I O <br />s~s~ n.no. ~oov s~, w«~. ae aao: ~aa~~ aa-rna <br />~.,:,:'n4°"+ R~`~°0'~°'°'"" Project Manager: Dave Hays <br />C09.01 OLD 6H0199 Pence/Kell Construction, Inc. DH <br />Tank removal at Church Street will have added cost. P/K is working on COR <br />D00.00 OLD 4114199 Pence/Kell Construction, Inc. JG <br />CIVIL CONCERNS <br />D02.03 OLD 4124/99 Centu West En inee~in - Salem EC <br />P/K does not have stamped copies of Geotec reports. Leonard wili forward. <br />5/6/99 - Owners need to request signed copies of Geotec Reports. <br />5h 3/99 - Owners have asked Eric Collins for the Geotec reports and Initial Geotec report with the certified <br />P.E. stamp. <br />6/3/99 - This item is still outstanding. <br />D05.02 OlD 5/6/99 ArbuCkle COStiC 14rChiteCts LL <br />A Proposal Request for boring 4" conduit across Court Street is forthcoming. <br />5/20/99 - P/K will locate existing conduit after perimeter wall is poured. A proposai request is forthcoming. <br />5/27i99 - Proposal Request 18 has been issued. <br />6/3/99 - Billy wants the proposai request to include pulling wire. Leonard will issue an additional proposal <br />request. <br />E00.00 OLD 4/14/99 Pence/Kel Construction~ Inc. JG <br />STRUCTURALCONCERNS <br />E09.01 OLD W10/99 ArbuCkle CostlC ArChlteCts LL <br />P/K to provide a discount for not installing the approximately 72 tendon locators. <br />P/K to provide cost for installing knockout sleeves for future services through the slab. <br />6/17/99 - P/K will price 3" sleeves. Aproximately 500 will be proposed on new layout from Leonard. Leonard <br />will also check the structural impact of putting blockouts on grid line. <br />F00.00 OLD 4H4/99 Pence/Kell Construction, Inc. JG <br />ARCHITECTURALCONCERNS <br />F04.02 OLD 4/6/99 Arbuckle Costic Architects LL <br />Owner's will verify that their Owner Supplied Operable Partitions (Detail 12/A5.2.1) will worlc to comply with <br />note 4 A6.5.3, A6.4.3 and A6.3.3. <br />5J.93/99 - .,P..atfitinns.are.aL2he .Court 1~ouse,~they.~avebeeR ~ ~r~. <br />5/20/99 - Randy Curtis will verify that this is what the owners want to use. <br />6/3/99 - Randy Curtis will verify if partitions are required on the project. Pence/Kelly wiil provide a VE . <br />proposal to eliminate. <br />6/10/99 - Leonard will provide a spec to price a new system. <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.