My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />' PENCE/KELLY <br />CONSTRUCTION, INC. <br />~ 2717 P~ne~ LooP SE. SaNm, OR 97~02 (50~) ~89-7]Y! <br />Portland (607) 274~bt7 F~x (50~) 583JIT7 <br />CCB N 6u36 <br />Meeting Minutes <br />No. 04 <br />Project Manager: Dave Hays <br />, ~ • a / ~ ~ <br />F04.02 NEW 4/6/99 Marion County BW <br />Owner's will verify that their Owner Supplied Operab~e Partitions (Detail 12/A5.2.1) will work to comply with <br />note 4 on A6.5.3, A6.4.3 and A6.3.3. (Provide One Hour Fire Protection.) <br />G00.00 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />MECHANICAL CONCERNS <br />G04.01 NEW 5/6/99 Innerface Sign Systems, Inc. PW <br />The Parking Level Duct Work is being redesigned by Interfiace Engineering to address low clearances in the <br />Parking Garage and Exaust fans. <br />H00.00 OLD 4N4/99 Pence/Kelly Construction, Inc. JG <br />ELECTRICAL CONCERNS <br />H03.01 OLD 4/29/99 Arbuckle Costic A~chitects LL <br />The T~ansformer support sled is being redesigned. Pence / Kelly needs any structural revisions immediately. <br />H04.01 NEW 5/6/99 Marion County BW <br />Owners to provide Security Camera heights and locations at the Bus Mall. (See RFI 183) <br />H04.02 NEW 5/6/99 Marion County BW <br />Owners will need additional Card Readers for 21 doo~s not noted on electrical prints. (see RFI 184.) <br />Melvin Mark requested that the security system be reviewed by the owners. Pence/Kelly needs rough-in <br />requirements. <br />100.00 OLD 4/14/99 Pence/Kelly Construction, (nc. JG <br />SUBMITTAL REVIEW <br />100.01 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br /> Please see the Submittal Log distributed during meeting. <br />J00.00 OLD 4h4/99 Pence/Kelly Construction, Inc. JG <br /> RFI REVIEW <br />J00.01 OLD 4N4/99 Pence/Kelly Construction, Inc. JG <br /> Please see the Outstanding RFI Log and items marked as urgent, distributed during meeting. <br />K00.00 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />ISSUE REVIEW <br />K01.01 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />Please see the Issue Log for items that may have a potential cost or time impact, distributed during meeting. <br />L00.00 OLD 4/14199 Pence/Kelly Construction, lnc. JG <br />MISCELLANEOUS <br />M00.00 OLD 4/23/99 Pence/Kelly Construction, Inc. JG <br />PARTNERING <br />M00.04 OLD 4/14/99 Melvin Mark Companies CL <br />Pence/Kelly has proposed that the owners consider a 50%/50% split on value engineering savings that are <br />generated by P/K and approved by the Owners. VE to be discussed in pa~tnering session. <br />5/6/99 - A Partnering meeting will be held Tuesday, 11 May, 1999. VE will be discussed. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.