My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
v <br />~ PENCE/KELLY <br />CONSTRUCTION. INC. <br />~ r,~..~. ~.6. ~«•~- o«.~m= ~~,:.._~- <br />r,~u.~w pos~ us.aw~ F.,~ ~aw~ eoa-~~n <br />ccs ~ aus <br />Meeting Minutes <br />No. 04 <br />Project Manager: Dave Hays <br />~ . . ~ • • ~ • t ~ • ' <br />C01.03 OLD 4/15/99 Pence/Kelly Construction, inc. DH <br />Pence/Kelly is still pricing the removal of the 3 tanks on North side of High St. Removal may impact traffic <br />signal. <br />4/29/99 - P/K will break out cost of traffic signal suppo~t for Street Scape, waiting for support design to <br />finalize pricing. <br />5/6/99 - Dave will finalize Proposal. <br />D00.00 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />CIVIL CONCERNS <br />D02.01 CLO 4/23199 Melvin Mark Companies CL <br />P/K needs the Geotec to review every footing subgrades before pouring conc. Melvin Mark supports this <br />and will review proposal to have Geotec on site 3 days a week. <br />5/6/99 - Geotec will be provided for 27 visits (3 per week). <br />D02.03 OLD 4/24/99 Marton County BW <br />P/K does not have stamped copies of Geotec reports. Leonard will forwarcl. <br />5/6/99 - Owners need to request signed copies of Geotec Reports. <br />D03.02 OLD 4J29199 5l7/99 Pence/Kel Construction~ Inc. DH <br />Dave tiays will provide method for tracking quantities and cost of Mass Excavation. Below Grade Filt, and <br />Contaminated Soil. <br />E00.00 OlD 4H4/99 Pence/Kell Construction, Inc. JG <br />STRUCTURALCONCERNS <br />E00.01 OLD 4/22/99 Pence/Kell Constructlon, Inc. JG <br />4/15/99 - Leonard will produce a layout of knockout 4" sleeves aprox. 9'4" apart for a proposal. Pence/Kelly <br />will provide a unit price. <br />4/22/99 - Tendon locators are still desired on this project. (See RFI-#15 - Issue #2) P/K wiU price. (Waiting <br />for P.T. Drawings) <br />E01.02 OLD 4J15199 Arbuckle Costic Architects LL <br />Melvin Mark is concemed with "hairy" appearance and finish quality of fibermesh in finished slabs. Tim said <br />that the fibeRnesh is for ~eduction in visual cracks, without fibertnesh the~e will be more visual cradcs! <br />Leonard will issue a p~oposal request to eliminate fibeRnesh on the 2nd thru roof slabs and changing the <br />ground floor building slab to stealth fibermesh. <br />4/22/99 - Tim Terich notes that even with visual cracking, the slab is structurally sound. A proposal request <br />on this is forthcoming. <br />4/29/99 - Awaiting Proposal Request <br />E04.02 CLO 516199 Pence/Kell Construction, Inc. JG <br />The excavator will be running the rock crusher fo~ double shifts (0630-2130) • <br />ppp,00 OLD 4h4/99 Pence/Kell Constructlon, Inc. JG <br />ARCHITECTURAL CONCERNS <br />F04.01 NEW 516199 PencelKelly Construction~ Inc. DH <br />Dave to present a product substitution on deck WP protection board. <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.