My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~, PENCE/KELLY <br />CON8TRUCTION, INC. <br />ra..,o. ~oe~ sE. :.am. ae.~ ~aoo, a~.-rn~ <br />~ l~) 2?~ip7 Fax (500) 6Y6 7477 <br />OCt f pN6 <br />Meeting Minutes <br />No. 87 <br />Project Manager: Dave Hays <br />Courthouse Square <br />LOCATION: Courthouse Square <br />MEETING DATE: 11/30/00 <br />SUBJECT: Construction Meeting <br />. <br />. , <br />Y <br />. <br />BW <br />. ~ • <br />Bil Wasson <br />~ .. . <br />Marion Coun <br />Y BMC Bob McCune Marion Coun <br />Y BC B ron Courts Melvin Mark Com anies <br />Y CL Crai Lewis Melvin Mar1c Com anies <br />N DH Dave Ha s Pence/Kell Construdion, Inc. <br />Y JH Jeff Hamm Salem Area Transit <br />Y JG John Gremmels Pence/Kell ConsUuction, Inc. <br />Y JW John Whittin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckle Costic Architects <br />N O Oliver Raab P.E. Interface En ineerin , Inc. <br />Y RC Rand Curtis Marion Coun <br />N SS Steve Schaad Pence/Keli Construction, Inc. <br />N TT Tim Terich Centu West En ineerin <br /> <br />A~•~ ~ . . ~ . .- ~ <br />OLD 4/14/99 :• ~ - <br />Pence/Kell Construction~ Inc. .I~ <br /> PERMIT STATUS <br />A86.01 OLD 11/2/00 Pence/Keily Construction~ inc. JG <br /> Electrical Permit. Jim Cook at interface has spoken to Bill Whiteside at the City, explained that a U.L. listed <br />EF unit, such as required on this project does not exist. Components within the EF's are U.L. listed. Bill said <br />that might be enough. <br />11/30/00 - EF's are U.L. recognized. See attached memo. Reinspection and sign-off will occur this week. <br />B~•~ OLD 4H4/99 Pence/Kelly Construction, Inc. ~~ <br /> SCHEDULE REVIEW <br />~•~ OLD 4/14/99 Pence/Kell Construction~ Inc. ~~ <br /> CIVIL CONCERNS <br />E~•~ OLD 4J14/99 Pence/Kell Construction, Inc. JG <br /> STRUCTURALCONCERNS , <br />F00.00 OLD 4/14/98 Pence/Keli Construction, lnc. JG <br /> ARCHITECTURAL CONCERNS <br />F83.02 OLD 11H/00 Pence/Kell Construction, Inc. JG <br /> Signage: <br />- Plaques: Enamel Wash didn't work. <br />- Kiosk frames - Installed <br />- Interior Signs: Cambeli will produce in house, will start today. Signs are going up <br />F84.01 OLD 11/8/00 ArbuCkle CostiC ArChiteCts LL <br /> LL to evaluate streetscape medallions. Include in punch list if necessary <br />G~•~ OLD 4/14/99 Pence/Kell Construction, Inc. JG <br /> MECHANICAL CONCERNS <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.