Laserfiche WebLink
PENCE/KELLY Meeting Minutes <br />CONSTRUCTION, INC. NO. H7 <br />t~a -.eo. i.oop s~. sr«,4 oR naos ~ws~ auam <br />oa~aa~ <br />~~~ ~+ F~` ~°0°~ ~'s" project Manager: Dave Hays <br />~ • . ~ . .- ~ :~ • <br />G82.01 OLD 10/25/00 Oregon Cascade Plumbin ~ Heatin DV <br />Toilet Sensors need to be adjusted. <br />11/1/00 - Sensors installed today <br />11/8/00 - Is the water presure to great at sinks? Toilets? <br />11/9/00 - P/K, Interface and Bob McCune wili meet with OCPH and sink sensor rep to resolve this issue. <br />11/30/00 - Sensor rep will be on sight next week. Will sort it out. <br />H~•~ OLD 4/14/99 Pence/Kelly Construction, Inc. ~~ <br />ELECTRICAL CONCERNS <br />H83.01 CLO 11/1/00 Pence/Kell Construction, Inc. ~~ <br />Streetscape Transformers are on order. P/K will get ETA. <br />Transformeres are on every other pole. ECC is searching for a transformer that will fit. The transformers <br />that were originally speced will not fit inside of poles. <br />11/30/00 - COR has been issued for 6 transformers on site and 4 off-site. <br />~~•~ OLD 11/8/00 Pence/Kelly Construction, Inc. JG <br /> CLOSEOUT <br />~•~ OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br /> SUBMITTAL REVIEW <br />~~•01 CLO 11/8/00 Electrical Construction Company p6g <br /> Electrical As Builts are beign redone by ECC <br />11/30/00 - These are under review by A/C <br />~~•~Z OLD 11/8/00 Arbuckle Costic Architects LL <br /> Electrical and Mechanical 08~M's are being reviewed by A/C <br />184.03 OLD 11/8/00 ArbuCkle CostiC ArChiteCts LL <br /> Mechanical, Underground, and Firesprinkler As-bults are under review by A/C <br />~~•~ OLD 17/8/00 Pence/Kell Construction~ Inc. JG <br /> General 08M manual will be turned over for review by 11h6 with index of manuals and required wanenties. <br />11/16/00 - General 08M's are under review <br />184.05 OLD 11/8/00 Pence/Kelly Construction, Inc. JG <br /> Prefunctional Checklist - Complete by Trane, will be reviewed by P/K before tumover. Expect by 11/16 <br />~•~ OLD 11/8/00 Pence/Kelly Construction, Inc. JG <br /> Tumover Items. List complete. P/K still owes 1 change of filters, and stock of paint. Expect by 11/16 <br />185.01 OLD 11/15/00 Ore on Cascade Plumbin 8 Heatin DV <br /> Trane has begun trending logs. <br />J00.00 OLD 4/14/99 Pence/Kelly Construction~ Inc. JG <br /> RFI REVIEW <br />~•01 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br /> The RFI log is closed <br />K~•~ OLD 4/14/99 Pence/Kell Construction, Inc. JG <br /> ISSUE 8 VE REVIEW <br />~•~ OLD 17/11/99 Pence/Kell Construction, lnc. JG <br /> MISCELLANEOUS <br />Page 2 of 3 <br />