My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 N T E R F A G E E N G i N E E R I N G <br />Cansuiting Enyineers <br />200 Hawthome Ave, SE #8-210 <br />Salem, OR 97301 <br />503.364.5354 OFFICE <br />503.364.5434 FAX <br />Project Memorc-ndum <br />SUB.IECT/PROJECT: Courthouse Sq Salem TC Revised Design <br />PROJECT NUMBER: 1996-0570.03 <br />TO: Leonard Lodder <br />Arbuckle Costic Architects, P.C. <br />363 State St <br />Salem, OR 97301-3533 <br />PHONE NUMBER: (503) 581-4114 F~ (503) 581-3655 <br />NUMBER• <br />DATE: October 13, 2000 <br />FROM: Jeff Stauffer <br />APPLIES ~ MECHANICAL <br />TO: ~ PLUMBING <br />^ EIECTRICAL <br />^ FIRE/LIFE SAFETY <br />^ LOW VOLTAGE <br />^ LIGHTING <br />^ TELECOM <br />Site Visit Dateci n~r~a~nn <br />1. EF-4 HVAC Contractor provide detail of fan inlet ducti . Completed <br />2. Col C/1 a HVAC Contractor rovide detail of duct adjusM~ent/depression at drain. Completed <br />Site V'~sit Dated 05/09/0~ <br />1. 1175 6"0-4 CD-1 off of TU-1-7 is under 26" medium pr~essure duct, and flex is Completed <br /> crimped. Move diffuser from tocation to one grid west, and p~vent from <br /> crimping. <br />2• 1233 8 0 spin-in off 36 x 18 from TU-1-10 is bent Replace befure flex Completed <br /> connection is made to LSD. <br />3. 1201 8' 0 flex not connected to LSD, off of FPB-1-12. Reconnect. Completed <br />4. Roof No cap on flue thru roof at L-12. Attach r 10/M6.1. Completed <br />Site Y~sit Dated 06h6/o~ <br />1. P109, 197, 198, EF-4, -7, -5, -3, -6 Installed on spring isolation. Fan inlet oonnections to Completed <br /> 209, 298 iNet plenums remaining to be completed. <br />Site Vsit Dateci ~RH 1mn an~ nsti~dinn <br />'!. Rm. 3231 <br />Waiting Themastat for Tu-3-16 is not installed. Install the Them~wstat as shown <br />on the drawin s. Completed <br />2. Rm. 3134 Loc~ation of 6x6 CEG-2 and 14x14 CTG-2 are reversed from the Completed <br /> Evidence loca6ons as shown on the plans. Depict on as-built drawings in the <br /> installed locations. <br />3. Rm. 3134 Location of Themiostat for TU-3-20 is not as shown on the plans. Depict Completed <br /> Evidence o~ as-built dra~nrings in the installed location. <br />Site Visit Dated 09H 2/00 <br />~' V <br />tib <br />l <br />123 $~ ~ CD-4 is broken. Re lace. ~m ~ <br />2• es <br />u <br />e <br />5 24 x 24 CRG-1 not installed. Install rille. Completed <br />3. St e 1234 8" Q1 CEG2 and 12 x 12 TG-2 are not i~stalled. Install the n'lles. Completed <br />4. to e 1283 6" fd CD-1 not installed. Install the diffuser. p~~ <br />5. Audio Visual <br />1253 -~~~t for TU-1-8 not installed. Install the them~ostat Completed <br />s' Assemby 1233 6" fd CD-6 as installed has inco~rect throw. Install 2 diffusers, 2-way, with <br />' <br /> throw as de <br />7. 1Cono rence ~emastat f~or TU-1-2 is instalted incoRectly. Co~rect the installation.~ }-T. ~ompleted <br />8. Elevato~ Lobby <br />1240 Thennostat for TU-1-3 not installed. Install the thertnostat Comp~eted <br />1J1~"1'K1~3U'1'1UN: Page 1 of 2 <br />M:~9828\Clerical\Observation Reports~M+E Puach lists~Ni101300Memo.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.