Laserfiche WebLink
9. Main Lobby <br />1200 Thennostat for FPB-1-6 not instailed. Install the thermostat. Completed <br />10. Office 5209 Thermostat for FPB-5-18 not installed. Install the thermostat. Completed <br />11. East Stair 5256 14 x 6 SG-1 not installed. Install the grille. Completed <br />12. 2o5n2erence Thermostat for TU-5-13 not installed. Install the thermostat. Completed <br />13. Conference <br />5174 2q x 24 CRG-1 not instalfed. Install the nlle. <br />9 ~ <br />Completed <br />Site Vsit Dated 10/12/00 <br />1. Stairs - East Overspray of green paint on grilles. <br /> and West <br />2. Breakroom Exhaust grilte c:ove~ed with paper - Remove paper <br /> 2136 <br />" ~...3~.__. <br />DISTRIBUTION: Page 2 of 2 <br />M:\9828\Clerical\Observation Reports~lVl+E Punch lists~1VI101300Memo.DOC <br />