My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />~ <br />_l <br />) <br />: ARBUCKLE COSTIC ARCHiTECTS, INC. <br />363 State Street FIELD OBSERVATION REPORT <br />Salem, Oregon 9730 I -3533 <br />(503) 581-4 I 14, Fax (503) 581-3655, E-mail: ~hrc~u@ar~kl~oui~.~«~ <br />, PROJECT: <br />' DATE: <br />Courthouse Square <br />September 1, 2000 <br />JOB NO. 9828 <br />REPORT 35 <br />NO. <br />PRESENT AT Leonard Lodder, AIA <br />' SITE: Marci Ayers, <br />This is a Punch List for the Fifth Floor Tenant Areas (Transit Administration Offices Only). <br />, 1. Generai: <br />a. At perimeter of window frames, cut paint to a clean, straight line, over sealant joint. <br />b. Final cleaning required following completion of sub-trade work. <br />' c. Install aii signage per contract. <br />2. Transit Expansion Space 5170: <br />, a. Specifications cail for gyp board to be primed. <br />b. Door 5172A requires the frame to be touched up and is missing the electric strike. <br />' <br />' <br />I~- <br />,JI <br />, <br />~ <br />~II <br />~~ <br />' <br />' <br />~ <br />~ <br />, <br />3. O~ce 5192: <br />a. Clean dust off of inside face of door. <br />b. Touch up scuff marlcs on door frame. <br />c. Door requires final coat of finish. <br />d. Touch up paint required on various scuffs on the south wall. <br />e. Chipped plastic laminate corner in the east end of the window. <br />f. Touch up crack in northwest corner. <br />g. Replace damaged ceiling tile. <br />h. Finger smudges on the west wall need to be touched up. <br />4. Library 5171: <br />a. Incomplete carpet seaming on north side of room. <br />b. Broken acoustical tile. <br />c. Touch up scuffed paint above data outlet on south wall. <br />5. Board Office 5161: <br />a. The door requires final coat of finish. <br />b. Touch up frame where it has been damaged by door insulation. <br />c. Green paint overspray on wall above door frame needs to be a removed. <br />d. Receptacle cover plate needs to be adjusted and several nicks in the gypboard on the south wall need to <br />be touched up. <br />e. Smudge on east wall near ceiling needs to be touched up. <br />6. Storage Room 5162: <br />a. General clean up of the floor required. <br />b. Reset lifted ceiling tile. <br />c. Touch up gypboard behind door frame. <br />d. Poor finish around penetrations into the partition that need to be repaired. <br />7. General Office Space 5173: <br />a. Touch up two spots on south wall nicks in the drywall need to be patched and touch up painted. <br />b. Cleanup after installation of horizontal blinds. <br />c. Touch up the mall angle above the window seems to be tape or something where it hasn't properly been <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.