My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.' \\ <br />COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />FIELD OBSERVATION REPORT NO. 35 <br />~ September I , 2000 <br />Page 3 of 7 <br />~ h. One screen handle has been removed and needs to be replaced. <br /> i. Touch up scuff marks on the northwest corner and touch up paint. <br />~ j. Overspray to the right of Door 5196 needs to touch up painted. <br />14. Office 5157: <br /> a. Remove ink marks from window sill. <br />~ b. Touch up under window sill, damaged finishes on the wall board. <br /> c. Remove paint overspray from wall angle. <br /> d. Touch up hole left by removal of cross-tee at grid. <br /> e. Repiace damaged cross-tees. <br />~ f. Touch up paint door frame paint overspray on wail. <br />15. Storage Room 5156: <br />' a. Reset ceiling tile. <br /> b. Vacuum floor. <br /> c. Clean overspray off of ceiling tees. <br />~ d. Refinish Door 5156A. <br /> e. Touch up paint immediately beside the door frame above the light switch. <br /> f. Touch up door frame just above carpet. <br />~ 16. Conference 5155: <br />a. Touch up Door Frame 5155A. <br />' b. Missing chair rail. <br />c. Reglue carpet base in northwest comer. <br />d. Casework is missing. <br />e. Final coat of paint required on the relites throughout. Note that some areas have not even received a first <br />~ coat of paint. <br />f. Remove bubble from under vinyl wall covering at relite. <br />~ 17. Hallway 5154: <br />a. Final coat of paint required on relite. <br />b. Touch up scuffs on west wall and remove green paint. <br />c. Dusting of east wall required throughout. <br />~ 18. Storage Room 5146: <br />a. Remove tape from tee grid and a little bit of overspray from tee gr~d as well. <br />'~ b. Touch up scuff on east wall. <br />19. The O~ce 5147: <br />~ a. Touch up paint on north wall at window. <br />b. Touch up door frame where it has been scuffed up from carpet install. <br />c. Remove overspray from wall angle. <br />d. Touch up paint on west wall near ceiling. <br />~ 20. Administration Office 5136: <br />a. Touch up paint on east wall and on south wall. <br />~ b. Touch up paint adjacent to a windowstool. <br />c. Replace damaged ceiling tile at the south side, southwest comer. <br />' 21. Office 5107: <br />a. Touch up door frames where they have been scuffed up from carpet install. <br />b. Remove overspray above door frame in the room by touching up with paint. <br />c. Touch up required at various spots on north wall of the room. <br />' d. Provide a continuous piece of clear anodized aluminum and fix in the head of the window to prevent door <br />
The URL can be used to link to this page
Your browser does not support the video tag.