Laserfiche WebLink
r _ <br />COURTHOUSE SQUARE <br />PROjEGT NO. 9828 <br />~ FIELD OBSERVATION REPORT NO. 35 <br />~ September I. 2000 <br />Page 4 of 7 <br />~ from opening more than four inches. <br />e. Repair damaged screen so that there are two screen pulls on the inside. <br />~ f. Cleanup overspray from wall angle at southwest comer. <br />g. General ciean up required on the windowstoois following installation of the blinds. <br />h. Touch up scuff marks on the south wall near the ceiling. <br />~ 22. Ha115133: <br />a. South watl at west end requires retexturing and repainting directly below the relite. Paint touch up to <br /> remove overspray of green paint onto the wall directly west of the relite. Cut the paint iMo the relite <br /> frame. <br />~ b. Remove paint overspray off of tees. <br /> c. Touch up various spots on the north wall. <br /> d. Touch up paint required above Door 5124. <br />~ e. Touch up paint required on various spots on south wall. <br /> f. Complete cutting in of carpet at Door 5230B <br /> g. Replace cross-tee. at east end of corridor. <br />~ h. Touch up paint required to cleanup overspray at Door 5100A. <br /> i. Wall paint needs to be cut in around perimeter poor Frame 5100A. <br /> j. Wall paint needs to be cut in at several locations at a number of other door frames as well. <br />~ 23. Acco <br />a. unting 5124: <br />Relite at west end of the room, one panel needs the head to be refinished to remove adhesive located <br />~ <br />b. under the paint. <br />Note that there are several locations where the carpet appears to be somewhat bubbled and needs to be <br /> fully adhered. <br /> c. Touch up paint on west wall in several locations. <br />~ d. Touch up paint required adjacent to data outlet under west relite. <br /> e. Complete painting of the stops in the east relite. <br /> f. " Movable glass panels require a handle to operate. <br /> g. Touch up paint required on glue or other discoloration at column cover. <br />~ h. Remove paint overspray from ceiling grid and cut wall paint up to wall angle in southeast comer. <br />~ 24. Office 5106: <br />a. Door requires final coat of finish. <br />b. Door frame needs to be touched up where it has been scuffed up from the carpet install. <br />c. General vacuuming of the floor is still require. <br />~ d. Remove tape from rubber base. <br />e. Patch and touch up gap at column cover in southeast corner. <br />f. Look at rubber base in northwest comer and get it properly seated. <br />~ g. Some touch up paint required on the west wall. <br />h. Ceiling tile damaged at sprinkler head. <br />25. Room 5123: <br />~ a. Door 5123A missing hardware and door needs to be refinished. <br />b. Frame 5123A needs to be touched up at the base where carpet has scuffed it up. <br />c. Room is incomplete as far as casework is concerned. <br />, d. Missing base undemeath the casework. <br />e. Touch up frame 51236 where it has been scuffed up by carpet install. <br />f. At 51236 cut wall paint into the door frame where gypboard is still exposed. <br />g. Touch up south wall to repair overspray and green dots on the wall. <br />~ 26. Break Room 5144: <br />a. Door 5144A needs final coat of finish. <br />, <br />