Laserfiche WebLink
COURTHOUSE SQUARE <br />~ ' \/ ~~'~ ~I <br />" PROJECT NO. 9828 <br />' FIELD OBSERVATION REPORT NO. 35 <br />~ September 1.2000 <br />Page 7 of 7 <br />' b. Door 52306 requires electric strike. <br />40. Conference Room 5252: <br />~ a. Door 5252C paint touch up required on door frame. <br /> b. Remove excess paint or garbage from the top of the door. <br /> c. Remove paint from vinyl wall covering behind Door 5252C. <br />~ d. Chair rail has not had final coat of finish applied to it. <br /> e. Missing floor box cover. <br /> f. Missing several wall cover plates, etc. <br /> g. Door 5252A gouged and damaged beyond repair, remove and replace with new door. <br />~ h. Touch up paint required at Door Frame 5252A. <br /> i. Door 5252A requires either a floor stop or an overhead stop to restrict its opening distance. <br /> j. Door 52526 is missing an electric strike. <br />~ k. Door stitl requires final coat of finish. <br />41. The balance of the County spaces on the fifth floor are below the standard that is acceptable for doing a Punch <br />~ List. <br />r <br />~ <br />~ <br />~ <br />~ <br />~ <br />cc: Billy Wasson, Marion County <br /> John Whittington, S.A.M.T.D. <br />1 Craig Lewis, Melvin Mark Development Corp. <br /> Bob McCune, Marion County <br /> Century West Engineering <br />M Intertace Engineering <br /> Westech Engineering <br /> Pence/Kelly Construction <br />~ File <br />File: 9828-9A <br />~ This confirms and records our interpretation of the discussions which occurred and our understanding reached during this meeting. <br />Please notify in writing within seven days of the date indicated above if the interpretation or description is incomplete or inaccurate. <br />~ <br />