Laserfiche WebLink
COURTHOUSE SQUARE <br />~ `l <br />" PROJECT NO. 9828 <br />~ FIELD OBSERVATION REPORT NO. 35 <br />September I, 2000 <br />Page 6 of 7 <br />' c. Overspray on wall adjacent to door frame needs to be touched up with wall paint. <br /> d. Reset rubber base in northwest comer. <br />~ e. Damaged ceiling tile near window diffuser. <br />33. Office 5101A: <br /> a. Door needs to be finished. <br />~ b. Touch up scuff marks on door frame. <br /> c. Remove pen markings from windowstool. <br /> d. Touch up paint required on west wall at a couple of points to remove scuff marks and green paint. <br />~ rces General Office 5100: <br />R <br />H <br />34. um esou <br />an <br /> a. Remove strange paint from west wall. <br /> b. Missing window blinds. <br />~ c. Paint overspray on north wali adjacent to Door 5120A. <br /> d. Paint as well on north wall near light switch. <br /> e. Door Frame 5100A needs to be touched up to remove scuff marks. <br />~ f. Door 5100A is not even in the frame. <br /> g. Door 5120A is also missing. <br />~ 35. Training Conference Room 5121 B: <br />a. Casework is unfinished. <br /> <br /> b. Missing chair rail. <br /> c. Missing carpet. <br />~ d. Missing floor box cover. <br /> e. Missing base. <br /> f. Door 5121 B requires final coat of finish. <br />~ g. Carpet install at Door 5121A is incomplete. <br />36. Office 5200: <br /> a. Touch up paint scuff marks on Door Frame 5200 and clean door. <br />I b. Refinish of door required to remove excess urethane in the top corner on inside face will need to be <br /> entirely refinished. <br /> c. Remove glue in carpet at northwest comer. <br />~ d. Touch up damaged wall board at northwest comer <br /> e. Touch up paint required above base in southwest comer. <br /> f. Touch up paint required on the column cover in the southeast comer near the ceiling. <br />~ 37 Room 5210: <br />i <br />I <br />t <br />. erv <br />n ew <br /> a. <br />b Door 52106 requires final coat of finish. <br />Door Frame 5210B requires touch up at the floor level to cover up scuff marks from the carpet install. <br />I . <br />c. touch up on south wall required to cover up scuff marks. <br /> d. Door 5210A frame requires touch up at the floor. <br /> e. Door 5210A requires final coat of finish on the outside. <br />~ <br />38. Reception 5120: <br /> a. Missing chair rail. <br /> b. Missing casework. <br />, c. Missing base. <br /> d. Missing carpet. <br />~ e. Generalty this space is unfinished. <br />39. Wait <br />a. ing Room 5230: <br />This room is generally unfinished, requiring the chair rail, base, carpet, caseworic, etc. <br />~ <br />