My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ;~ <br />' Cf~URTHOUSE SQUARE <br />' PROJECT NO. 9828 <br />~ FIELD OBSERVATION REPORT NO. 36 <br />September 14, 2000 <br />Page 2 of 2 <br />~ <br />9. Janito~'s Room 4244: <br />, a. General clean-up is required in this room. <br />b. A final coat of paint is stiil required on some of the walls to cover up patching. <br />c. Paint access panel on the cei~ing. <br />1 d. Paint concxete wall on east side of the room. <br />10. Women's Restroom 4254: <br />~ a. Door 4254A has a significant dent on the room side about 5'-0" above the floor 6" from the striped side. <br />b. Adjust hardware on door 4254A to permit proper closing. <br />c. Sealant required around top of the combination paper towei dispenser receptacle. <br />' d. Remove pencil ma~lcs from toilet partitions handicapped unit. <br />e. Paint access panel under the vanity. <br />~ 11. Men's ResVoom 4243: <br />a. Sealant bead is required on the top portion of the paper towel dispenser and waste receptacle. <br />b. Adjust hardware on Door 4243A to permit proper closing. <br />~ c. Soon be hard on the a portion of the to early at a whole Spencer and what is a cool. <br />d. Paint access panel under the vanity. <br />e. The basins don't seem to be working properly in terms to the infer-red protectors. <br />~ f. Paint access panel in handicapped stall. <br />g. Remove glue from toilet partition and handicapped stail. <br />' <br />~ <br />~ <br />~ <br />cc: Billy Wasson, Marion County <br />1 John Whittington, SA.M.T.D. <br />Craig Lewis, Melvin Mark Development Corp. <br />Bob McCune, Marion County <br />~ Century West Engineering <br />Interface Engineering <br />Westech Engineering <br />Pence/Keliy Construction <br />' '~ 1 'k''. <br />File: 982&9A <br />~ This confimns and reoords our interpretation of the discussions which occurred and our understanding reached during this meeting. <br />Please notify in writing within seven days of the date indicated above if the interpretation or description is incomplete or inaccurate. <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.