Laserfiche WebLink
' COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />FIELD OBSERVATION REPORT NO. 39 <br />' September 25, 2000 <br />Page 3 of 6 <br />' b. Missing speaker. <br /> c. Missing ceiling tile needs to be reinstalled. <br /> d. At Door 1270A ~ door frame needs to be touched up to cover up scuff marks. <br />i <br />' e. C <br />ean Door 1270A. <br /> f. Note: There are several drip marks on the door, the door will need to be refinished to remove the drip <br /> marks. <br /> g. Missing valance covers at the break room casework. <br />' h. Paper towel dispenser at the break room sink needs to be installed. <br /> i. Reset receptacles for proper access in the back panel of the dishwasher/microwave cabinet. <br /> j. Doors in front of accessible area under sink are missing. <br />~ k. Hardware group for poor 1270C is missing the push button acxess control. <br /> I. Clean down dust off the top of the lockers. Note: There are several locations on the north wali where the <br /> finish was damaged and has been spackled and painted over without proper texturing. <br />, 17. Women's Restrooms 1273: <br /> a. Door 1273A requires final coat of finish. <br /> b. Clean up required on Door Frame 1273A. <br />' c. Clean paint and/or other material from the top edge of the shower stall. <br /> d. Where did the 'oddball' coat hook come from in the shower stall? <br /> e. Replace the hook in the shower stail and the handicap stall with the standard hook used as a door stop. <br /> f. Loose stainless steei cover on piastic laminate partition system needs to be sealed up. <br />' g. Paint the access cover in the handicap stall. <br /> h. Remove pencil marlcs from plastic laminate toilet partitions. <br />, 18. Men's Restroom 1272: <br /> a. Door 1272A requires final coat of finish. <br /> b. Patch ceiling above door. <br /> c. Remove paint from interior of shower stall. <br />, d. Popped screw ln the ceiling above the shower stall adjacent to light fixture. <br />- e. . Adjust the end of the light fixture above the shower stall. <br /> f. Paint access panel in the back wall in the middle stall. <br />, g. Adjust infrared panel on the handicapped urinal to make it square. <br /> h. Adjust sensitivity of the infrared controls on the basins. <br /> i. Clean up scuffs on ceramic wall tile. <br /> j. Waxing of floor adjacent to door has not been comptetely right to the door. <br />' k. Note: Door 12706 requires a final coat of finish. <br /> I. Above this door remove sawdust and other detritus from vinyl wall covering. <br />~ 19. Hall 1150: <br />a. Door 1175D requires final coat of finish. <br />b. Final cleaning of base is still required. <br />' c. Clean marks off comer guards. <br />d. Final cleaning of floor required. <br />e. Final finish of chair rail still required. <br />' 20. Door 1240A: <br />' <br />a. Clean up the metal frame at the window. <br />b. It appears that a final coat of finish is required at this door. <br />' c. The door frame still needs a flnal coat of finish as well.] <br />d. Frame S141C requires some touch up paint <br />e. Clean marks off vinyl wall covering. <br />' 21. Data/Com Room 1152: <br />a. Requires floor finish. <br />