My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Miscellaneous
>
CS_Courthouse Square
>
Meetings Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:34:24 AM
Creation date
8/5/2011 2:34:11 PM
Metadata
Fields
Template:
Building
RecordID
10094
Title
Meetings Miscellaneous
Company
Staton Construction, INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square Manaqer's Meeting <br />April 2, 1997 <br />Present: Randy, Elyn, Bob, Dan, Richard, Peggy <br />Randy opened the meeting by asking Elyn to introduce Peggy Mitchell to the group. <br />new Property Clerk and will be assuming support duties for the Courthouse Square P <br />Demolition and Abatement Update: <br />The bids were reviewed on April 1. Two contractors have been selected. The abate <br />contractor will probably be subcontracted to the demolition contractor. The selec <br />in below the $1.2mi1 that was budgeted for abatement and demolition. The contract <br />award are for $750k. <br />Randy is starting to get inquiries from individuals wanting bricks from the site. <br />contracts have been awarded, the contractor will be in control of the site. The b <br />value of salvaging and recycling. As the county's representative, Bob will be in <br />with the contractor. David will draft the contract. It will probably be on the <br />next Wednesday. <br />The date for the parking swap will remain the same. If there are changes to the s <br />will notify Elyn. <br />Randy said that according to some of the bids they reviewed, the abatement and dem <br />begin with the Community Development building and move clockwise around the block. <br />may have to skip a building, and back track later, if some of the tenants do not <br />schedule. The Senator parking lot will be used for staging. <br />Annex: <br />Bob reported that he has contracted with a carpet cleaning company. They started <br />worked until late in the evening. The telephone switch is on the wall and the pho <br />are pulling wire. He has hired two temporaries to help. Dan has marked out the s <br />He'll begin marking out the space allocation for the offices today so they can beg <br />partitions. <br />Bob has reviewed the contract for the Best building and it specifies that we are r <br />maintenance of the lighting and heating equipment. Frank Dunn has been very coope <br />McCann is putting in light bulbs. Dan walked through with a light meter and they <br />sixty candles. <br />Bob reported that the painting is complete, except the space for Liberty House, Ne <br />There was discussion around how the painting and cleaning the carpet has improved <br />appearance of the office space. <br />Microwave Tower: <br />Elyn reported that equipment for the microwave tower has arrived. Bill Worcester <br />
The URL can be used to link to this page
Your browser does not support the video tag.