My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Miscellaneous
>
CS_Courthouse Square
>
Meetings Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:34:24 AM
Creation date
8/5/2011 2:34:11 PM
Metadata
Fields
Template:
Building
RecordID
10094
Title
Meetings Miscellaneous
Company
Staton Construction, INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the site, but hasn't begun working on it. Dan has provided him with the floor pla <br />ACTION: Elyn will follow up on the microwave set up. To help facilitate the <br />she'll contact Bob Hansen. <br />Relocation: <br />Elyn and Bob are still fine tuning the moving schedule. Many departments have alr <br />their customers of the dates of their move. Those that have done this are relucta <br />changes to their moving schedule. <br />Leases: <br />Randy asked Elyn for the reports on the budget for the departments renting space i <br />Elyn doesn't have all the numbers at this time but she is finding that a couple of <br />will have a little leeway. For the most part, there is no opportunity to raise th <br />She doesn't have the numbers that departments are using in their 97/98 budget. Ra <br />the departments are, minimally, using last year's numbers (96/97). He is looking <br />subsidy for the Annex over the next two years. <br />ACTION: Elyn will find out what amounts departments are budgeting for 97/98. <br />Other: <br />Dan reported that we have the occupancy permit from the county. <br />Bob asked if there has been any discussion around the Best signs. There are two s <br />signs and one on the front of the building. We will have to contract with someone <br />sign from the building face. The doors will have to modified by disconnecting the <br />floor pads. <br />Dan gave Randy samples of the county signage for the Annex, to review. <br />There was discussion around the floor plans and access to Purchasing and the Copy <br />warehouse. The current layout doesn't show a pathway to the warehouse. Purchasin <br />will be using the side entrance. Randy suggested that Richard send a letter to hi <br />letting them know which entrance to use. <br />The entrance doors to the Annex will be keyed the same as the Senator Building. <br />have been asking about the hours of operation for their offices. This is somethin <br />departments will have to address. Elyn has had departments ask if we will pay for <br />business cards, letterhead and envelops with the new address. Richard will print <br />and envelops and bill the cost to the project. Print orders for business cards wi <br />out. The departments will be told to save their old business cards. It is possib <br />address of Courthouse Square will be 220 High Street NE. <br />Elyn emphasized that county employees and the public cannot take materials and eq <br />departments are throwing away. She has been getting questions from employees on t <br />also pointed out that the moving boxes cannot be destroyed or taken by employees o <br />members. They cost $.50 each and are to be returned to the mover. <br />
The URL can be used to link to this page
Your browser does not support the video tag.