My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Miscellaneous
>
CS_Courthouse Square
>
Meetings Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:34:24 AM
Creation date
8/5/2011 2:34:11 PM
Metadata
Fields
Template:
Building
RecordID
10094
Title
Meetings Miscellaneous
Company
Staton Construction, INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square Managers Meeting <br />March 12, 1997 <br />Present: Bob McCune, Randy Curtis, Elyn Lyon, Linda Millington, Dan Wilson <br />Randy opened the meeting by reporting that Craig Luedeman has contacted him about <br />Randy has assigned one of the private offices for his use. Unless he is contacte <br />he will not be assigning any offices. <br />Elyn is taking care of the moving schedule, space allocation and phone and compute <br />Neighbor to Neighbor and Liberty House. <br />Microwave Tosver: Tom Frey has told us that the county will need a conditional use p <br />microwave tower. It will take 45 days to process. Randy asked Elyn to find out i <br />and if so, are there legal ways to get around this requirement. <br />ACTION: Elyn will determine if we need a permit. If so, she will get Legal in <br />If we do need a permit, we will go ahead with the tower while the permit is in pro <br />schedule. Randy asked that we inform the involved parties that we are going to pu <br />without a permit. <br />ACTION: Elyn will ensure that everyone involved is aware that we are going to <br />the tower while the permit is in process. <br />There was discussion around using fiber optic as the alternative. Elyn reported t <br />has been our contact with TCI. TCI has not been responsive to the county's inquir <br />for some conversations with Carol about TCI. <br />Moving Schedule: Referring to Bob's schedule, Randy asked where we are on the sc <br />if it is feasible to meet the schedule. Bob reported that telecommunication and a <br />are issues. Elyn reported that we also are having problems with US West. They ar <br />any information on the installation. Other options have been investigated and the <br />TCI and US West. Randy said that it is important for us to adhere to this schedul <br />West. We have been told that due to the network, Fiscal and Community Development <br />at the same time. Bob said that it doesn't matter if we move them together or not <br />a week or more to set them up. These departments are expecting some down time. B <br />if they move on Friday or Saturday, it is possible to get the key workstations up <br />Randy said that is not our function to determine how Fiscal handles the move. We <br />know when they will move and information on planning to be down. Based on what we <br />is not certain that we can meet the first week schedule. <br />The moves are all scheduled to start on Fridays. We pay the movers regular time o <br />overtime on Sunday. Anything over 8 hours is paid at overtime. The departments i <br />understand that we are going to phase the move and if necessary the schedule may h <br />
The URL can be used to link to this page
Your browser does not support the video tag.