My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Miscellaneous
>
CS_Courthouse Square
>
Meetings Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:34:24 AM
Creation date
8/5/2011 2:34:11 PM
Metadata
Fields
Template:
Building
RecordID
10094
Title
Meetings Miscellaneous
Company
Staton Construction, INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square Project <br />LEED Certification <br />June 17,1999 Meeting Minutes <br />Attendees: <br />Tracy Hokanson, Interface Engineering <br />Billy Wasson, Marion County <br />Jim Sears, Marion County <br />Randy Curtis, Marion County <br />Bob McCune, Marion County <br />Bonnie McCullough, Marion County <br />Leonard Lodder, Arbuckle Costic Architects <br />Oliver Raab, Interface Engineering <br />Craig Lewis, Melvin Mark Development <br />Byron Courts, Melvin Mark Development <br />John Gremmels, Pence/Kelly <br />Actions Required: <br /> Expected <br /> Completion <br />Action Responsible Party Date <br />Inquire about purchasing the DOE2 study from PGE and the cost of <br />the study. Bryon Courts June 25 <br />Put together cost proposal to pursue outstanding credits and <br />forward to Holly Stirnkorb. Leonard Lodder June 25 <br />Attempt to negotiate credit for the water conserving fixhues with <br />the LEED Committee. Holly Stimkorb July 9 <br />Attempt to negotiate credit for a permanent air monitoring system <br />with the LEED Committee Holly Stirnkorb July 9 <br />Next Meeting: <br />Thursday, July 1, 1999 <br />10:30 a.m. <br />Arbuckle Costic Architects, 363 State Street, Salem, Oregon <br />Minutes: <br />I. Review LEED Credits That Have Been Achieved <br />Holly Stirnkorb distributed an updated LEED Compliance Evaluation Matrix and reviewed the <br />eleven points that have been achieved. The Matrix contains an error. It states that the IPMVP <br />credit has been achieved. This credit depends on access to the DOE2 study, which is pending the <br />decision to participate in the PGE Earth Smart program. As a result, a total of eleven points have <br />been achieved rather that the twelve points listed on the Matrix. <br />Holly explained that the LEED pilot program also offered a green building rating at the Pioneer <br />Level for achieving twenty points. <br />II. Discuss LEED Credits That Require Clarifications or Modifications <br />The group discussed the outstanding credits as follows: <br />• Infill Develonment - Clarificarion is needed from the City of Salem, but it is highly likely <br />that the point can be achieved. <br />• Enerev EfficiencYLevel 1- Oliver Raab discussed his cost proposal to achieve this point. <br />
The URL can be used to link to this page
Your browser does not support the video tag.