My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ Marion County Facilities Master Plan <br />~ Generally, the HVAC and plumbing systems appear to be in good operation. <br />r The condition of domestic water piping is unknown. <br />I ~ <br />~ ELECTRICAL <br />~ <br />L~ The electrical service and distribution equipment for this building is located <br />in a basement room at the southwest comer of the building. <br />~~ The service is rated 1200A, 480Y/277V. Installation of the existing <br />equipment occurred in 1974. The 480Y/277V system serves ihe HVAC <br />~ system, elevators and fluorescent Gghting. A 300KVA dry type transformer <br />creates a 208Y/]20V distribution system for receptacle, appliance and <br />~ incandescent lighting loads. The electrical equipment room is not properly <br />L~ ventilated and the heat rejected to ambient &om the transformer causes the <br />room temperature to rise to undesirable levels. <br />I The branch circuit panelboards for 480Y/277V and 208Y/120V systems are <br />~ located in vertically stacked mechanical rooms on each floor. <br />~ The typical lighting throughout of6ces is recessed fluorescent lensed <br />~ Inm;na;rrc. Corridor lighting is provided by incandescent R lamp downlights. <br />I_ Telephone and data distribution throughout this building is provided by <br />j terminal boards locaCed in vertically stacked closets accessed &om the <br />comdor. <br />~~ The computer room is located on the fifth floor. A fiber optic cable <br />terminator is located within the computer room. This room serves as the <br />'_ ~ distribution hub for data cabling. <br />L The fire alarm control panel is located in the basement electrical room. The <br />~ Simplex fire alazm control panel monitors fire sprinkler flow switch for <br />basement fire sprinkling system and smoke / ionization detectors throughout. <br />L The alarm signaling devices do not comply with current requirements for <br />1 hearing impaired visual signals. <br />1 <br />~' <br />L Page 79 <br />~ <br />^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.