Laserfiche WebLink
Page 3 <br />2nd Recommendation: <br />Long term lease with a Priva[e Veterinarian building a faciliry to meet the needs of the county <br />Advantages: Addresses all the needs including fundin~ <br />Disadvantages The controlling of cost and space needs may change due to the lack of ownership, <br />creating the same situation, Dog Control is in now <br />3rd Recommendation <br />Building an Office on or near the Humane Society site, and adding on security parking, unloading, <br />meeting rooms and storage space. Receiving a long term (10 year lease) with cost issues specifi- <br />cally laid out <br />Advantages AddressesmostofimmediateneedsoftheCounty,doesnotdealwithlongtermspace <br />• needs. Would continue the lease and eliminate the difficulties of discontinuing the lease. <br />Disadvantages The controlling of cost and space needs may change due to the lack of ownership, <br />creating the same situatioq Dog Control is in now. The strained working relationship <br />remains. <br />7. Priorities, Tune Frames and Funding Options <br />The Office space should be answered and corrected in the ne~ct years. <br />Current Lease ofKennel and Office Space would be about the same as operating our own Shelter (see <br />May 3 meeting) and with Inmate Labor may be less than current operating costs. <br />Staffwould be more efficient and cut down in duplication between Of~ce and Kennel paperwork( See <br />May 3) <br />