My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />Justice Center vs Public Service Bldg. <br />1 <br />2. <br />3 <br />What is the annual dollar amount contributed to the Court operations by Marion County? <br />Answer: $442,000 + $586,000 = $1.208.000 <br />How much square footage is currently allocated to Court functions? <br />Answer: Courthouse- 37,000 net sq. feet <br />All Bldgs- 46,000 net sq. feet <br />What aze the estimated costs and space needs of the proposed new Justice Center vs the new Public <br />Service Building? <br />***** Analysis ***** <br />Current space available in downtown bldgs. (net) <br />Courthouse 74,000 nsf <br />Franklin 18,000 nsf <br />Senator 64,000 nsf <br />CDC (Ticor) 13,000 nsf <br />Court proposal for new Justice Center <br />Estimated space needs in year 2013 is 90,000 nsf <br />Cost for new Justice Ctr. (90,000 ~ 65 % net to gross) <br />90,000 net = 138,000 gross sq. ft. <br />138,000 gsf x$135 sq. ft=$18.6 million <br />$18.6 million construction cost <br />$ 1 million demolition cost <br />$ 5.5 million remodel cost of Co. offices @ CTH. <br />$25.1 million <br />Downtown proposal for Public Service Bldg. <br />Estimated space needs for County in year 2013 is 110,000 nsf <br />New Public Serv. Bldg. (110,000 @ 80 % net to gross) <br />110,000 net = 138,000 gross sq. ft. <br />138,000 gsf x$135 sq. ft. _$18.6 million <br />$18.6 million construction cost <br />$ 1 million demolition cost <br />$ 3.1 million remodel cost for Courts @ CTH. <br />$22.7 million <br />Note: If the Sheriff's Office remains at the Courthouse, they will need at least 10,000 nsf. Courts would <br />reach capacity in the Courthouse in 10 yeazs or less. <br />
The URL can be used to link to this page
Your browser does not support the video tag.