Laserfiche WebLink
. <br />Justice Center vs Public Service Bldg. <br />1 <br />2. <br />3 <br />What is the annual dollar amount contributed to the Court operations by Marion County? <br />Answer: $442,000 + $586,000 = $1.208.000 <br />How much square footage is currently allocated to Court functions? <br />Answer: Courthouse- 37,000 net sq. feet <br />All Bldgs- 46,000 net sq. feet <br />What aze the estimated costs and space needs of the proposed new Justice Center vs the new Public <br />Service Building? <br />***** Analysis ***** <br />Current space available in downtown bldgs. (net) <br />Courthouse 74,000 nsf <br />Franklin 18,000 nsf <br />Senator 64,000 nsf <br />CDC (Ticor) 13,000 nsf <br />Court proposal for new Justice Center <br />Estimated space needs in year 2013 is 90,000 nsf <br />Cost for new Justice Ctr. (90,000 ~ 65 % net to gross) <br />90,000 net = 138,000 gross sq. ft. <br />138,000 gsf x$135 sq. ft=$18.6 million <br />$18.6 million construction cost <br />$ 1 million demolition cost <br />$ 5.5 million remodel cost of Co. offices @ CTH. <br />$25.1 million <br />Downtown proposal for Public Service Bldg. <br />Estimated space needs for County in year 2013 is 110,000 nsf <br />New Public Serv. Bldg. (110,000 @ 80 % net to gross) <br />110,000 net = 138,000 gross sq. ft. <br />138,000 gsf x$135 sq. ft. _$18.6 million <br />$18.6 million construction cost <br />$ 1 million demolition cost <br />$ 3.1 million remodel cost for Courts @ CTH. <br />$22.7 million <br />Note: If the Sheriff's Office remains at the Courthouse, they will need at least 10,000 nsf. Courts would <br />reach capacity in the Courthouse in 10 yeazs or less. <br />