My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. The cost is estimated at $17.5 million for three pods. The cost of an additional <br />pod would be $1.75 million. <br />2. Concern was expressed about the county's ability to provide additional <br />operating funds for the expanded facility. It was sugoested that a new tax base would be <br />required to support this program. <br />D. OPTIONS CONSIDERED <br />1. The committee considered the option of addin~ new detention and program <br />facilities to the existing building. This oprion was rejected because the cost savings 3re small <br />(approximately $500,000) and the staged construction would be disruptive to the existing <br />programs. Some temporary relocation of existing programs would also be required during <br />construction. <br />2. The committee also considered a subcommittee finding that remodeling of the <br />existing building for detention related programs is more costly than traditional office uses <br />because of unique code and safety problems. <br />E. RISKS AND LIABILITIES <br />l. Some concern was expressed about city and neighborhood objections to an <br />expanded facility. This concern was aclrnowledged, but overridden by a strong commitment <br />to support youth related inxervention programs. It was also noted that, unlike state <br />corrections facilities, the young people who are served by th.is facility are primarily Marion <br />County residents. <br />2. Increased traffic on Center Street was also discussed. There are two projects <br />under consideration which may reduce the traffic impact on the neighborhood. The city is <br />considering a widening project for Center Street and the county is planning a new access <br />road south connecting with State Street. <br />PAGE 10 <br />kei/~r1/F'ac.itities.Int 03/1R/'95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.