My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
when vacated, and the remodeling of the existing Health Department building. <br />4. The county may find it appropriate to submit these four projects (totalling <br />approximately $53 million) to the voters in a single package. This would facilitate getting under <br />way with all four at the earliest possible time. On the other hand, the county would be putting <br />all of its public safety and health "eggs" in one basket, where it might want to reserve some of <br />those eggs for use in helping to pass bonds for development of other less popular facilities. <br />5. Upon construction of the Tri-Agency facility, the Corrections Department's <br />administrative offices and field services personnel should be moved out of the work release center <br />and into the Tri-Agency facility, and the vacated space in the work release center should be <br />converted to additional beds. <br />6. Phase II of the Health Department project, involving the addition of up to 29,000 <br />squaze feet of new space to the existing Health Department building, should occur only if and <br />when the department outgrows the remodeled Health Department building and the juvenile <br />building provided for it during Phase I. <br />7. The Public Works relocation of most of its personnel to the Silverton Road site <br />should move forwazd within the next two to three years. Public Works has separate funding <br />available to finance the development of their proposed new facility, and this move will permit <br />the department to deliver services more effectively and will free up space in the Senator Building <br />to accommodate, on a temporary basis, county non-court departments and agencies which are <br />now located in the courthouse and which may need to be relocated in the next five years to <br />accommodate more space for the courts in the courthouse. <br />8. The county should proceed within the next six months to complete a thorough <br />analysis of the Equitable Building, and should proceed to purchase the same within three years <br />PAGE 32 <br />ksj/cd/Facilities.[nt 04/07/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.