Laserfiche WebLink
Plan Options <br />Plan A: Maintains and renovates existing building inventory. Growth of general <br />government offices is accomodated through leases, (94,045 NSF). New <br />construction is required for Detox, Adult Residential, Juvenile, . and Correc- <br />tions, (91,433 GSF). Options include replacing leased space wi[h new <br />construction. <br />Cost Estimate: $38 million <br />Plan B: The Counry will sell the Franklin, and demolish the Senator building. The <br />Beri and Ticor buildings may be displaced by a new Public Service building, <br />(161,301 GSF). The Courthouse would be renovated to accomodate new court <br />facilities and upgraded security. ~ <br />New construction will also be required to accommodate Dog control, OSU <br />Extension, Detox, Adult Residen[ial, and Archives, (40,873 GSF). The <br />Health, Juvenile, and Corrections facilities will be expanded, (99,379 GSF). <br />Additional downtown parking would be required to accommodate 588 vehicles. <br />CosC Estimate: $60 million <br />Plan C: This option is similar to plan B; however, the public service building is <br />smaller, (85,385 GSF). The key element of this plan is the relocation of the <br />Criminal Courts to a new facility on the Corrections campus,(86,181 GSF). <br />General government and non-criminal courts would continue to occupy the <br />Courthouse. The Franklin Building would be retained for 10 years and then <br />sold. - <br />The Health, Juvenile, and Corections facilities would expand as required in <br />plan B. Dog Control, OSU Extension, Archives, Detox, and Adult Residential <br />will either lease of build new space. Additional downtown pazking will also <br />be needed. <br />Cost Fstimate: $59 million <br />Tri-agency Law Enforcment Facility: This facility is in addition to options noted above. <br />Space needs are 131,123 GSF. Cost is estimated at $26 million. <br />Satellite Offices: Satellite office needs aze estimated a[ 35,670 GSF. If the County <br />constructs new space rather than leases, the cost is estunated at $7.6 million: <br />