My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- Marion County Facilities Master Plan <br />~ ALTERNATIVE PLAN OPTIONS <br />1.0 Overview <br />. This facilities master plan indicates with increased demographics within the county, <br />additional space will need to be acquired for the County in order to provide services <br />- as they currently are providing today. This space acquisition can be in the fonn of <br />. both leased spaced and new construction. The consultant Team has developed three <br />alternative options indicating how the county might meet future space needs. Cost <br />estimates for each altemative plan option is included in Chapter'E'. <br />_ Each option focuses on the Counry's eleven existing building inventory. ~ These <br />buildings are grouped into three main area: DOWNTOWN, CENTER STREET and <br />' CORRECTTONS Sites. In most cases, projected space requirements is based on a Net <br />_ Squaze Footage (NSF). In order to Gross Squaze Footage (GSF) the NSF is given <br />a factor to include walls, circulation and building support spaces. Net Square Footage <br />' is used to determine lease cost and Gross square Footage is used to determine new <br />_ construction cost. <br />' As identified in the data base (See "Appendix A"), projections are made in two <br />- incremenu. The incremental projection are for the years 2003 and 2013. In general, <br />these increments not only meet growth patterns in a logical manner, but are used as <br />, a method for identifying space requirements. <br />The Satellite Services Marion County provides, in addition to the Downtown, Center <br />Street, and Correction Sites, are analyzed separately relative to their projected <br />growth. These satellite services, while an outgrowth of a particulaz departments, do <br />not impact the respective sites, identified above, even if the Satellite services are <br />expanded or remained the same. <br />Page 106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.