My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />Marion County Tri-Agency Facilities Master Plan <br />5.0 BUILDING PROGRAM, STTE CRITERIA, AND COST ESTIMATE <br />The development of a preliminary building and site program, and in turn, the project cost <br />estimates, are based on the following elements: <br />1. The consolidation program for the three law enforcement agencies; <br />2. The proposed building stacking program which illustrates adjacency requirements <br />between divisions and section of each department; <br />3. The parking requirements for staff, secured department vehicles and visitors; and <br />4. The size and number of other site elements. <br />Each of these elements are suminarized in the following paragraphs. <br />Consolidation Program <br />During the first week in July 1993, the consultant team presented the recommendations for <br />consolidation and joint-use space.between the three agencies. The agency representatives <br />reviewed this document and appropriate modifications were suggested. These suggestions <br />were incorporated into the 5na1 space requirements database. The consolidation/joint-use <br />space needs which were recommended in that report have been formatted into the 7Yi- <br />Agency Space Program. The finalized space requirements are summarized in Fxhibit 19 for <br />the projection period of 1998.- 2013. Exhibit 20 shows the proposed program for the <br />projection year 2003 and details space reductio~s and additions resulting from consolidation <br />and shared use space. <br />The consolidation/joint-use program forms the foundation for the deve]opment of the <br />building program and site development criteria. <br />Page 30 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.