My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County Facilities Master Plan <br />percent efficient. (New boilers guarantee 80 percent efficiency). <br />Cooliog is provide through several different air conditioning units located <br />through-out the building. Some cooling equipment uses air cooled <br />condensing and some use water cooled condensing. Nu~ety five percent of the <br />building is mechanically cooled. Areas not currently being cooled indude <br />sheriffs department, the jury reom, and maintenance personal offices. <br />Court rooms aze air conditioned, but because of high ceilings and the <br />conditioned air being supplied and retumed at the ceiling, they are <br />uncomfortable. In general, mechanical equipment has been well maintained,- <br />but normal ageing has occurred and could require replacement in the next 5 <br />years. <br />The fourth floor remodel incorporafes e3cisting roof top, packaged equipment <br />that may last for 10 to 15 years. Because it is on the roof the AC units can be <br />easily replaced. <br />~Plumbing seenu in good worldng order but will need ADA upgrading in some <br />areas. The domestic water piping could be expected to start showing signs <br />of discoloring, if it isn4 now. <br />Fire spritil:lers in basement only. Controls could be upgraded to computer <br />data processing system. <br />ELECTRICAL <br />The electrical service and distribution equipment is located in the basement <br />near the southwest comer of the building. System voltage characteristics are <br />208Y/120V. <br />A 1350A bus duct rises up t}uough stacked closets at the core stair and serves <br />the lighting, receptacle and appliance loads for floors one through four.. <br />•The owne~s records indicate that the peak demand of 420KW occurs during <br />the months of July through August. The maximum load occurs during a <br />cooling cycle. <br />Page 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.