My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />~, Marion Count Facilities <br />~ <br />~ <br />Plan <br />The apartmem's side is heated by original steam radiators with individual hand <br />valve controls. <br />Appro~rimatdy 60 percent of the office areas on the second, third and fourth <br />floor aze heated by steam radiators which are controlled by either hand valve <br />controls or "thennostatic" valve control, both of which aze inefficient. The <br />remaining 40 percent of the offices on these floors are heated by hot water <br />convection radiators which run the length of the east and west walls of these <br />areas. There is only one control valve for each length of radiator which gives <br />very unsatisfactory control as the radiators pass through individual, private <br />offices on each floor along with computer rooms and open office areas, <br />The first floor is a mixture of all the above systems along with gas fired heat <br />pwnp which serves the fIousing Authority offices in the Northeast comer of <br />the floor. <br />The District Attome}~s offices in the Northeast corner of the floor are heated <br />by a gas fired air handler.' <br />The stores/copy room area of the first floor is heated by rivo split unit electric <br />heat pumps which are in the air conditioning mode most of the time because <br />of the heat radi~ted into the area from the boiler room below. <br />The basement has no direcc heating system There is no air conditioning in the <br />apartments. ~ <br />Air conditioning is provide to the office sections of the second, third, and <br />fourth floor from three roof top units which are about 20 yeazs old. These <br />units often develop refi-igerant leaks which require considerable work to repair <br />as the leaks often occur in hard to reach azeas of the equipment. <br />The basement conference room and the Marpo Credit Union are air <br />conditioned by stand alone units for those azeas. The cooling tower for the <br />Ma~po units needs to be replaced as it is developing leaks and is very <br />inefficient. <br />The Purchasing/Mail room is air conditioned by residential, window mount <br />style air condirioners. <br />Page 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.