Laserfiche WebLink
ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, Oregon 97301-3533 <br />(503) 58 I-4 I I 4, Fax (503) 581-3b55, E-fllail: architecu@arbucklecostic.com <br />PROJECT: <br />DATE <br />Cou~thouse Square <br />October 2, 2000 <br />Revised October 20, 2000 <br />Revised January 10, 2001 <br />PRESENT AT SITE: <br />Leonard Lodder, AIA <br />FIELD OBSERVATION REPORT <br />JOB NO. 9828 <br />REPORT NO. 41 R (2) <br />The following is a Punch List for the Parking Level: <br />General: <br />a. There is still water coming in along Grid 3, 3A. <br />cc: Billy Wasson, Marion County <br />John Whittington, S.A.M.T.D. <br />Craig Lewis, Melvin Mark Development Corp. <br />Bob McCune, Marion County <br />Century West Engineering <br />Interface Engineering <br />Westech Engineering <br />Pence/Kelly Construction <br />File <br />~ <br />___ --~- <br />By: Leonard Lodder, AIA <br />File: 9828-9A <br />This confirms and records our interpretation of the discussions which occurred and our understanding reached during this meeting. <br />Please notify in writing within seven days of the date indicated above if the interpretation or description is incomplete or inaccurate. <br />