My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Team
>
CS_Courthouse Square
>
Meetings Team
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:40:36 AM
Creation date
8/8/2011 10:47:33 AM
Metadata
Fields
Template:
Building
RecordID
10096
Title
Meetings Team
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street FIELD OBSERVATION REPORT <br />Salem, Oregon 97301-3533 <br />(503) 581-4 I I 4, Fax (503) 58 I-3655, E-f71SII: architecu@arbucklecostic.com <br />PROJECT: Courthouse Square JOB NO. 9828 <br />DATE: August 25, 2000 REPORT 34 R(2) <br />Revised October 20, 2000 NO. <br />Revised January 10, 2001 <br />PRESENT AT Leonard Lodder, AIA <br />SITE: <br />This is a Punch List for the Roof Areas. <br />High Roof Area: <br />a. Require roof inspection report from Umpqua. <br />b. Repair boot at base of stair to Elevator Machine Room. <br />c. A boot located at the northeast side of Unit AC-4 that is torn. <br />d. There is a significant amount of the roof tread material on top of the roof that has a lot of air underneath it. <br />The roof should be fully adhered. (Particularly at elevator machine room). <br />e. Loose roof at northeast corner of AC.1, at 8'-0" north of corner. <br />Elevator Machine Room R140: <br />a. Needs a door stop for the door in the open position. <br />cc: Billy Wasson, Marion County <br />John Whittington, S.A.M.T.D. <br />Craig Lewis, Melvin Mark Development Corp. <br />Bob McCune, Marion County <br />Century West Engineering <br />Interface Engineering <br />Westech Engineering <br />Pence/Kelly Construction <br />File <br />File: 9828-9A <br />This confirms and records our interpretation of the discussions which occurred and our understanding reached during this meeting. <br />Please notifv in writinq within seven days of the date indicated above if the interpretation or description is incomplete or inaccurate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.